CDM planning period
CDM planning period refers to the specific timeframe during which the Construction (Design and Management) Regulations (CDM) planning and preparation activities take place for a construction project. The CDM regulations are a set of health and safety regulations that apply to construction projects in the United Kingdom. The planning period is a crucial phase where key considerations and actions are taken to ensure the project is executed safely and effectively. Here are some key aspects of the CDM planning period:
1. Pre-construction Phase: The planning period typically occurs during the pre-construction phase of a project. It starts as early as the initial design stages and continues until construction work begins on site.
2. Appointing the Principal Designer and Principal Contractor: During the planning period, the client must appoint a Principal Designer and a Principal Contractor. The Principal Designer is responsible for coordinating health and safety aspects during the design phase, while the Principal Contractor takes charge of health and safety during the construction phase.
3. Assessing and Managing Risks: Risk assessments and risk management activities are conducted during the planning period. Hazards and risks associated with the project are identified, evaluated, and appropriate control measures are put in place to mitigate them.
4. Health and Safety Plan: A health and safety plan is developed during the planning period. This plan outlines how health and safety will be managed throughout the project, including measures to protect workers, visitors, and the general public.
5. Cooperation and Communication: Effective cooperation and communication among all parties involved in the project are established during the planning period. This includes ensuring collaboration between the client, designers, contractors, and any other stakeholders to ensure a coordinated and safe approach to the project.
6. Information Exchange: Relevant health and safety information is shared during the planning period. Designers provide information on the design and construction requirements to ensure health and safety considerations are incorporated from the start.
7. Competence Assessment: Competence assessments are carried out during the planning period to ensure that all individuals involved in the project have the necessary skills, knowledge, and experience to perform their roles safely.
8. Documenting the CDM Plan: The outcomes of the planning period, including risk assessments, health and safety plans, and other relevant documents, are compiled into a CDM plan. This plan serves as a reference and guide for the project's health and safety management.
It's important to note that the specific duration of the CDM planning period can vary depending on the size, complexity, and nature of the construction project. The planning period should be given adequate time and attention to ensure that health and safety considerations are properly addressed and integrated into the project's execution.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.