Surface water run-off
(Created page with "Surface water run-off is: 'Water flow over the surface of roofs and ground surface to a drainage system. Ground surface run-off occurs if the ground is impermeable, is saturated ...") |
|||
Line 19: | Line 19: | ||
* Home Quality Mark. | * Home Quality Mark. | ||
* Sustainable urban drainage systems. | * Sustainable urban drainage systems. | ||
+ | |||
+ | [[Category:BREEAM]] [[Category:Sustainability]] |
Revision as of 15:24, 5 March 2019
Surface water run-off is: 'Water flow over the surface of roofs and ground surface to a drainage system. Ground surface run-off occurs if the ground is impermeable, is saturated or if the rainfall is particularly intense.'
Volume of run-off is: 'The volume of run-off that is generated by rainfall occurring on the site. This is typically measured in cubic metres. Additional predicted volume of run-off is the difference between the volumes of run-off; pre-development, greenfield and post development.'
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
Related articles on Designing Buildings Wiki
- BRE articles.
- BREEAM Surface water run-off.
- Building Research Establishment.
- Design flood event.
- Design flood level.
- Greenfield run-off rate.
- Greenfield volume of run-off.
- Pre-development.
- Home Quality Mark.
- Sustainable urban drainage systems.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.