Building regulations
Line 112: | Line 112: | ||
For more information, see Full plans. | For more information, see Full plans. | ||
− | On small projects, or when changes are made to an existing building, approval may be sought by giving a 'building notice'. In this case, a building inspector will approve the works as they are carried out by a process of inspection. This does leave the client at risk that completed works might not be approved, resulting in remedial costs. | + | On small projects, or when changes are made to an existing building, approval may be sought by giving a 'building notice'. In this case, a building inspector will approve the works as they are carried out by a process of inspection. This does leave the client at risk that the completed works might not be approved, resulting in remedial costs. |
For more information, see Building regulations inspection. | For more information, see Building regulations inspection. | ||
Line 118: | Line 118: | ||
Full plans approvals are also subject to inspection during the course of the works at stages decided by the local authority (typically during the construction of foundations, damp proof courses and drains and perhaps other key stages), but as long as the work is carried out in accordance with the approved design, the risk of problems is very much reduced. | Full plans approvals are also subject to inspection during the course of the works at stages decided by the local authority (typically during the construction of foundations, damp proof courses and drains and perhaps other key stages), but as long as the work is carried out in accordance with the approved design, the risk of problems is very much reduced. | ||
− | In the event of disagreement about an approval, a ‘determination’ can be sought (before the works start) from the Secretary of State for Communities and Local Government or from Welsh Ministers in the Welsh Assembly Government. It is also possible to seek relaxation or dispensation of the regulations from the building control department of the local authority under certain circumstances | + | In the event of disagreement about an approval, a ‘determination’ can be sought (before the works start) from the Secretary of State for Communities and Local Government or from Welsh Ministers in the Welsh Assembly Government. It is also possible to seek relaxation or dispensation of the regulations from the building control department of the local authority under certain circumstances. |
− | It is important to ensure that a completion certificate is sought from the approving body as evidence that the works comply with the regulations. | + | It is important to ensure that a completion certificate is sought from the approving body as evidence that the works comply with the regulations. NB: Under changes to the building regulations made in December 2012, Local Authorities must give completion certificates, they do not need to be requested. |
− | + | ||
− | NB: Under changes to the building regulations made in December 2012, Local Authorities must give completion certificates, they do not need to be requested. | + | |
A full plans approval notice is valid for three years from the date of deposit of the plans. This can be very important given the speed at which the regulations change, meaning that a building which has been approved, but not built may require re-design and further approval if construction is delayed and the regulations change. | A full plans approval notice is valid for three years from the date of deposit of the plans. This can be very important given the speed at which the regulations change, meaning that a building which has been approved, but not built may require re-design and further approval if construction is delayed and the regulations change. | ||
− | Failure to comply with the Building Regulations can result in a fine and/or an enforcement notice requiring rectification of the works. There is also a | + | Failure to comply with the Building Regulations can result in a fine and/or an enforcement notice requiring rectification of the works. There is also a regularisation process for getting approval for works that have been carried out without approval. |
− | NB: Where demolition work is proposed, the owner must give the local authority building control department six weeks notice under Section 80 of | + | NB: Where demolition work is proposed, the owner must give the local authority building control department six weeks notice under Section 80 of the Building Act. |
It is possible to appeal against building regulations decisions if: | It is possible to appeal against building regulations decisions if: | ||
Line 139: | Line 137: | ||
= Scotland = | = Scotland = | ||
− | In Scotland, Scottish Ministers are responsible for the Building Regulations (Building Standards) and associated guidance (Ref. [http://www.scotland.gov.uk/Topics/Built-Environment/Building/Building-standards The Scottish Government: Building Standards]). The | + | In Scotland, Scottish Ministers are responsible for the Building Regulations (Building Standards) and associated guidance (Ref. [http://www.scotland.gov.uk/Topics/Built-Environment/Building/Building-standards The Scottish Government: Building Standards]). The local authorities administer the Building Standards system and are responsible for granting permissions (Building Warrants) and Completion Certificates. |
= Wales = | = Wales = | ||
Line 149: | Line 147: | ||
= Northern Ireland = | = Northern Ireland = | ||
− | In Northern Ireland, the Building Regulations (Northern Ireland) 2012 are made by the Department of Finance and Personnel | + | In Northern Ireland, the Building Regulations (Northern Ireland) 2012 are made by the Department of Finance and Personnel. They are administered by the District Councils. |
= Reform = | = Reform = | ||
− | On 14 July 2017, following the Grenfell Tower Fire, the BBC reported that a full review of the building regulations would be undertaken | + | On 14 July 2017, following the Grenfell Tower Fire, the BBC reported that a full review of the building regulations would be undertaken. (Ref. [http://www.bbc.co.uk/news/uk-40602991 http://www.bbc.co.uk/news/uk-40602991]) |
On 19 July 2017, the Local Goverment Association (LGA) called for the review to be “urgent and immediate”. Lord Porter, LGA Chairman, said; "We cannot wait for the result of the public inquiry or coroner’s report before this review is started. We have to act based on what we know now". (Ref. [https://www.local.gov.uk/about/news/lga-calls-urgent-and-immediate-building-regulation-review https://www.local.gov.uk/about/news/lga-calls-urgent-and-immediate-building-regulation-review]) | On 19 July 2017, the Local Goverment Association (LGA) called for the review to be “urgent and immediate”. Lord Porter, LGA Chairman, said; "We cannot wait for the result of the public inquiry or coroner’s report before this review is started. We have to act based on what we know now". (Ref. [https://www.local.gov.uk/about/news/lga-calls-urgent-and-immediate-building-regulation-review https://www.local.gov.uk/about/news/lga-calls-urgent-and-immediate-building-regulation-review]) | ||
On 28 July 2017, Communities Secretary The Rt Hon Sajid Javid MP announced an independent review of the building regulations and fire safety. See Independent review of the building regulations and fire safety for more information. | On 28 July 2017, Communities Secretary The Rt Hon Sajid Javid MP announced an independent review of the building regulations and fire safety. See Independent review of the building regulations and fire safety for more information. | ||
− | |||
− | |||
In April 2020, the Ministry of Housing, Communities & Local Government published the [https://www.gov.uk/government/publications/final-report-of-the-expert-group-on-structure-of-guidance-to-the-building-regulations Final report of the expert group on structure of guidance to the building regulations]. The report considered the structure of the current guidance that supports the building regulations and identified 8 high level recommendations for reform. | In April 2020, the Ministry of Housing, Communities & Local Government published the [https://www.gov.uk/government/publications/final-report-of-the-expert-group-on-structure-of-guidance-to-the-building-regulations Final report of the expert group on structure of guidance to the building regulations]. The report considered the structure of the current guidance that supports the building regulations and identified 8 high level recommendations for reform. |
Revision as of 07:18, 23 November 2021
Introduction
The first set of national building standards was introduced in 1965. Now known as the Building Regulations, they set out:
- What qualifies as ‘building work’ and so falls under the control of the regulations.
- What types of buildings are exempt (such as temporary buildings).
- The notification procedures that must be followed when starting, carrying out, and completing building work.
- Requirements for specific aspects of building design and construction.
The regulations
In England, the Department for Levelling Up, Housing and Communities is responsible for the Building Regulations 2010 and The Building (Approved Inspectors etc.) Regulations 2010. The regulations apply to most new buildings and many alterations to existing buildings.
A series of approved documents provide general guidance about how specific aspects of building design and construction can comply with the Building Regulations.
The requirements are set out in Schedule 1 of the regulations:
Part A: Structure
Requires that buildings are designed, constructed or altered so as to be structurally safe and robust, and so as not to impair the structural stability of other buildings. Part A stipulates design standards for use on all buildings and gives simple design rules for most masonry and timber elements for traditional domestic buildings. It includes diagrams of structures such as roof frames and brick walls, and tables of material strengths.
Part B: Fire safety
Covers all precautionary measures necessary to provide safety from fires for building occupants, persons in the vicinity of buildings, and firefighters. Requirements cover means of escape, fire detection and warning systems, the fire resistance of structural elements, fire separation, protection, compartmentation and isolation to prevent fire spread, control of flammable materials, and access and facilities for firefighting.
See Approved document B for more information.
Part C: Site preparation and resistance to contaminants and moisture
Includes the weather-tightness and water-tightness of buildings, subsoil drainage, site preparation, and measures to deal with contaminated land, radon, methane, and all other site related hazardous and dangerous substances.
Part D: Toxic substances
This controls hazards from the toxic chemicals used in insulation and relates the use of urea formaldehyde (UF) foam.
See approved document D for more information.
Part E: Resistance to the passage of sound
Deals with requirements for sound insulation between buildings, including both new dwellings and the conversion of buildings to form dwellings. It covers sound reduction between rooms for residential purposes and designated rooms in dwellings, and acoustic conditions for common areas in flats and schools.
Part F: Ventilation
Includes standards for ventilation and air quality for all buildings. It also covers requirements for the prevention of condensation.
Part G: Sanitation, hot water safety and water efficiency
Lays down standards for the provision of sanitary and washing facilities, bathrooms and hot water provision. It also covers safety requirements for unvented hot water systems.
See Approved Document G for more information.
Part H: Drainage and waste disposal
Requires that adequate drainage is provided, and also deals with pollution prevention, sewage infrastructure and maintenance. Technical design standards cover sanitary pipework, foul drainage, rainwater drainage and disposal, wastewater treatment, discharges and cesspools.
Part J: Heat producing appliances and Fuel storage system
Covers the construction, installation and use of boilers, chimneys, flues, hearths and fuel storage installations. Also requirements for the control of fire sources and the prevention of burning, pollution, carbon monoxide poisoning, etc.
Part K: Protection from falling, collision and impact
Sets standards for the safety of stairways, ramps and ladders, together with requirements for balustrades, windows, and vehicle barriers to prevent falling. Also included are requirements for guarding against and warning of, hazards from the use and positioning of doors and windows.
Part L: Conservation of fuel and power
Controls the insulation values of buildings elements, the allowable area of windows, doors and other openings, the air permeability of the structure, the heating efficiency of boilers, hot water storage and lighting. It also controls mechanical ventilation and air conditioning systems, space heating controls, airtightness testing of larger buildings, solar emission, nad the certification, testing and commissioning of heating and ventilation systems, and requirements for energy meters. It also sets requirements for Carbon Index ratings.
See Approved Document L for more information.
Part M: Access to and use of buildings
Requires the inclusive provision of ease of access to, and circulation within, all buildings, together with requirements for facilities for people eith disabilities.
See Approved Document M for more information.
Part N: Glazing - Safety in relation to impact, opening and cleaning
(Withdrawn).
Part P: Electrical safety
Covers the design, installation, inspection and testing of electrical installations in order to prevent injuries from electrical shocks and burns, and to prevent injuries arising from fires due to electrical components overheating or arcing.
See Approved Document P for more information.
Part Q: Security - Dwellings
Requires that reasonable provision is made to resist unauthorised access to any dwelling; and any part of a building from which access can be gained to a flat within the building.
See Approved Document Q for more information.
Part R: Physical infrastructure for high-speed electronic communication networks
A requirement for infrastructure enabling the installation of copper or fibre-optic cables or wireless devices capable of delivering broadband speeds of more than 30 Mbps.
See Approved Document R for more information.
Regulation 7: Materials and workmanship
A requirement for carrying out building work using the proper materials and in a workmanlike manner.
See Approved document 7 for more information.
Procedure
Building Regulations approvals can be sought either from the building control department of the local authority or from an approved inspector. In either case, a fee will be payable, relative to the type of building and the construction cost. Fee schedules can be obtained from the building control department of the local authority. It is now also possible for competent persons to self-certify that their work complies with the building regulations without submitting a building notice or incurring local authority fees.
Full plans or building notice
Generally on larger, new-build projects, a 'full plans' application will be made, meaning that full details of the proposed building works are submitted for approval before the works are carried out.
For more information, see Full plans.
On small projects, or when changes are made to an existing building, approval may be sought by giving a 'building notice'. In this case, a building inspector will approve the works as they are carried out by a process of inspection. This does leave the client at risk that the completed works might not be approved, resulting in remedial costs.
For more information, see Building regulations inspection.
Full plans approvals are also subject to inspection during the course of the works at stages decided by the local authority (typically during the construction of foundations, damp proof courses and drains and perhaps other key stages), but as long as the work is carried out in accordance with the approved design, the risk of problems is very much reduced.
In the event of disagreement about an approval, a ‘determination’ can be sought (before the works start) from the Secretary of State for Communities and Local Government or from Welsh Ministers in the Welsh Assembly Government. It is also possible to seek relaxation or dispensation of the regulations from the building control department of the local authority under certain circumstances.
It is important to ensure that a completion certificate is sought from the approving body as evidence that the works comply with the regulations. NB: Under changes to the building regulations made in December 2012, Local Authorities must give completion certificates, they do not need to be requested.
A full plans approval notice is valid for three years from the date of deposit of the plans. This can be very important given the speed at which the regulations change, meaning that a building which has been approved, but not built may require re-design and further approval if construction is delayed and the regulations change.
Failure to comply with the Building Regulations can result in a fine and/or an enforcement notice requiring rectification of the works. There is also a regularisation process for getting approval for works that have been carried out without approval.
NB: Where demolition work is proposed, the owner must give the local authority building control department six weeks notice under Section 80 of the Building Act.
It is possible to appeal against building regulations decisions if:
- The applicant considers the project should not have to comply with building regulations.
- The project is refused building regulations approval and the applicant believes the decision is unfair.
For more information see: Building regulations appeal.
Scotland
In Scotland, Scottish Ministers are responsible for the Building Regulations (Building Standards) and associated guidance (Ref. The Scottish Government: Building Standards). The local authorities administer the Building Standards system and are responsible for granting permissions (Building Warrants) and Completion Certificates.
Wales
In Wales, Building Regulations that previously applied to England and Wales continue to apply, but from 1 January 2012, any revisions to the English regulations apply to England only. New regulations and guidance are the responsibility of the Welsh government. Approvals are granted by the local authorities.
See Welsh building regulations for more information.
Northern Ireland
In Northern Ireland, the Building Regulations (Northern Ireland) 2012 are made by the Department of Finance and Personnel. They are administered by the District Councils.
Reform
On 14 July 2017, following the Grenfell Tower Fire, the BBC reported that a full review of the building regulations would be undertaken. (Ref. http://www.bbc.co.uk/news/uk-40602991)
On 19 July 2017, the Local Goverment Association (LGA) called for the review to be “urgent and immediate”. Lord Porter, LGA Chairman, said; "We cannot wait for the result of the public inquiry or coroner’s report before this review is started. We have to act based on what we know now". (Ref. https://www.local.gov.uk/about/news/lga-calls-urgent-and-immediate-building-regulation-review)
On 28 July 2017, Communities Secretary The Rt Hon Sajid Javid MP announced an independent review of the building regulations and fire safety. See Independent review of the building regulations and fire safety for more information.
In April 2020, the Ministry of Housing, Communities & Local Government published the Final report of the expert group on structure of guidance to the building regulations. The report considered the structure of the current guidance that supports the building regulations and identified 8 high level recommendations for reform.
Related articles on Designing Buildings
- ACM cladding.
- A guide to installing thermostatic mixing valves: what, why and how.
- Approved documents.
- Approved inspector.
- Building codes.
- Building control body.
- Building control performance standards.
- Building notice.
- Building regulations appeal.
- Building Regulations Advisory Committee (BRAC).
- Building regulations completion certificate.
- Building regulations inspection.
- Building warrant (Scotland).
- Competent person.
- Competent person schemes.
- Do the building regulations apply to existing buildings?
- Failure to comply with the building regulations.
- Full plans.
- Hot water safety in health and social care settings.
- How long it takes to get building regulations approval and how long it lasts.
- Independent review of the building regulations and fire safety.
- Licensing.
- National Calculation Method.
- Northern Ireland building regulations.
- Planning permission.
- Regularisation.
- Simplified Building Energy Model.
- Scottish building standards.
- Standard Assessment Procedure.
- Statutory approvals.
- Statutory authorities.
- The Building Act.
- The difference between planning permission building regulations approval.
- Welsh building regulations.
- What approvals are needed before construction begins.
External references
- Approved documents can be downloaded from the Planning portal.
- The Communities and Local Government Building Regulations website.
- Department for Communities and Local Government: Building Regulations, Explanatory booklet. (now archived)
- Local authority building control guidance.
- The Building Regulations in full.
- Department for Communities and Local Government.
- CLG: Determinations and appeals.
- Free online version of Approved Documents from SpecifiedBy
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.