BREEAM Flood risk management
Line 36: | Line 36: | ||
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria. | BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria. | ||
− | = Related articles on Designing Buildings | + | = Related articles on Designing Buildings = |
* BREEAM Surface water run-off. | * BREEAM Surface water run-off. |
Revision as of 16:42, 9 February 2022
Contents |
Aim and benefits
Awaiting content
When to consider
Awaiting content
Step by step guidance
Awaiting content
Questions to ask while seeking compliance
Awaiting content
Tools and resources
Awaiting content
Tips and best practice
Awaiting content
Typical evidence
Awaiting content
Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- List applicable schemes here
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
Related articles on Designing Buildings
- BREEAM Surface water run-off.
- Changing attitudes to property flood resilience in the UK
- Design flood event.
- Design flood level.
- Flood.
- Home Quality Mark.
- Building Research Establishment.
- Flood and Water Management Act.
- Flood plain
- Flood risk
- Flood risk assessment.
- Flood risk management plan
- Flood zone
- Flood defences
- Planning for floods.
- Property flood resilience
- Sustainable urban drainage systems.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.