The CDM regulations require that, 'A client must make suitable arrangements for managing a project, including the allocation of sufficient time and other resources.'
The time allocated by the client under this part of the regulations must be notified to the Health and Safety Executive (along with other information) as soon as is practicable before the construction phase begins. See Notify HSE for more information.
This 'CDM planning period' is intended to allow contractors sufficient time to assess health and safety issues and plan their works before commencing construction. Duty holders will need to ensure that enough time is allowed for this in the programme, both for the appointment of contractors and sub-contractors (including trade contractors and works contractors on construction management or management contract projects).
The regulations do not say how long the CDM planning period should be, as this will vary significantly depending on the nature of the works that are being carried out. However, if the time allocated is short, the Health and Safety Executive (HSE) may consider that insufficient time has been allowed. Clients may discuss with duty holders how long they believe the CDM planning period should be and should also consult with proposed contractors.
The client must not allow work on site to proceed unless a construction phase plan has been prepared, at least for the early stages of the works, and arrangements made for the development of the rest of the plan. The construction phase plan sets out how health and safety will be managed during the construction of the project.
Find out more
Related articles on Designing Buildings Wiki
- CDM.
- Construction phase plan.
- Contractor.
- Health and safety.
- Mobilisation.
- Notify HSE.
- Pre-construction information.
- Principal contractor.
- Programme consultant.
- Scheduling construction activities.
- Site facilities.
- Site layout plan.
- Welfare facilities.
External references
- A detailed list of the possible contents of pre-construction information can be found in appendix 2 of Managing health and safety in construction Construction (Design and Management) Regulations 2007 Approved Code of Practice.
- Construction (Design and Management) Regulations (2007).
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.