Fair payment practices for construction
Line 26: | Line 26: | ||
*Causes of construction disputes. | *Causes of construction disputes. | ||
*Default payment notice. | *Default payment notice. | ||
+ | *Housing Grants, Construction and Regeneration Act. | ||
*Payment notice. | *Payment notice. | ||
*Pay less notice. | *Pay less notice. | ||
*Remedies for late payment. | *Remedies for late payment. | ||
*Scheme for Construction Contracts. | *Scheme for Construction Contracts. | ||
− | |||
=== External references === | === External references === | ||
Line 36: | Line 36: | ||
*[http://www.legislation.gov.uk/ukpga/1996/53/contents The Housing Grants, Construction and Regeneration Act]. | *[http://www.legislation.gov.uk/ukpga/1996/53/contents The Housing Grants, Construction and Regeneration Act]. | ||
*[http://www.designingbuildings.co.uk/wiki/Scheme_for_Construction_Contracts Scheme for Construction Contracts]. | *[http://www.designingbuildings.co.uk/wiki/Scheme_for_Construction_Contracts Scheme for Construction Contracts]. | ||
− | *OGC [http://www.constructingexcellence.org.uk/pdf/lgtf/Guide_to_best_Fair_Payment_Practices.pdf Guide to best fair payment practices]. | + | *OGC: [http://www.constructingexcellence.org.uk/pdf/lgtf/Guide_to_best_Fair_Payment_Practices.pdf Guide to best fair payment practices]. |
*[http://www.jctltd.co.uk/public-sector-supplement-form.aspx JCT Public sector supplement]. | *[http://www.jctltd.co.uk/public-sector-supplement-form.aspx JCT Public sector supplement]. | ||
Revision as of 07:37, 19 March 2013
The Housing Grants, Construction and Regeneration Act 1996 (also known as the Construction Act) include provisions to ensure that payments are made promptly throughout the supply chain. These provisions include:
- The right to be paid in interim, periodic or stage payments.
- The right to suspend (or part suspend) performance for non-payment and to claim costs and expenses incurred and extension of time resulting from the suspension.
- The client must issue a payment notice within five days of the date for payment, even if no amount is due. Alternatively, if the contract allows, the contractor may make an application for payment, which is treated as if it is the payment notice.
- The client must issue a pay less notice if they intend to pay less than the amount set out in the payment notice, setting out the basis for its calculation.
- The notified sum is payable by the final date for payment.
- If the client (or specified person) fails to issue a payment notice, the contractor may issue a default payment notice. The final date for payment is extended by the period between when the client should have issued a payment notice and when the contractor issued the default payment notice. If the client does not issue a pay less notice, they must pay the amount in the default payment notice.
- Pay when certified clauses are not allowed, and the release of retention cannot be prevented by conditions within another contract.
On public sector projects, the OGC Guide to best fair payment practices (endorsed by the Public Sector Construction Clients’ Forum which recommends adoption of its principals by public sector clients) sets out additional procedures for public sector projects. The procedures are intended to ensure transparent, and proper payments are made to the main supply chain members within 30 days. They can been integrated into JCT (The Joint Contracts Tribunal) contracts by making amendments set out in the JCT Public sector supplement.
The recommendations in the OGC Guide to best fair payment practices include:
- The drafting of a fair payment charter that is signed up to by the client and the main supply chain members.
- Transparency regarding payment procedures throughout the supply chain, and the provision of information relating to payments works (for example information about a particular work package that appears on certificates for the main contract) so that it is clear what sub-contractors and sub-sub-contractors can expect to be paid and when.
- Any amount to be withheld should be justified (also now required by the Construction Act).
- All contracts (including sub-contracts and sub-sub-contracts) should be valued on the same day, the ‘common valuation date’.
- All payments should be made no more than 30 days from the date when the payment was first valued, the ‘common valuation date’. This may involve paying main contractors before the 30 days has expired, so that subsequent payments to sub-contractors and sub-sub-contractors can all be made within 30 days. The JCT Public sector supplement proposes payment under the main contract within 19 days and payment to sub-contractors within 23 days, allowing payment to sub-sub-contractors within 30 days. NB if the valuation date is before the due date (certification generally precedes the due date on construction contracts), then payment should be made within 30 days of the valuation date, not the due date.
- Provisions in relation to protection in the event of insolvency.
NB The Office of Government Commerce (OGC) has now been absorbed into the Efficiency and Reform Group (ERG) within the Cabinet Office. OGC guidance has been archived, however, it is cited in the Government Construction Strategy and the Common Minimum Standards, and links are provided to OGC documents from government websites such as the Major Projects Authority.
Find out more
Related articles on Designing Buildings Wiki
- Causes of construction disputes.
- Default payment notice.
- Housing Grants, Construction and Regeneration Act.
- Payment notice.
- Pay less notice.
- Remedies for late payment.
- Scheme for Construction Contracts.
External references
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.