Articles required
Line 283: | Line 283: | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| | | |
Revision as of 07:29, 11 October 2015
This is a list of articles that are needed on Designing Buildings Wiki.
- If you are writing one of these articles, please put your initials in the notes next to the title, so that others do not to start writing the same article.
- When you have finished an article, delete it from the list.
- If you have ideas for other articles, add them to the list.
Title | Notes |
Abortive costs |
|
Accessibility |
Universal design exists |
Accounts |
|
Accredited construction details |
|
Acquisitions |
|
Approvals (home office …environmental health etc) |
Statutory approvals exists |
Archaeologist / archaeological consultant |
|
Articles of agreement |
|
Audit |
|
BACS - Building Automation and Control System |
|
Best value |
|
Bidding |
|
Building automation |
CW |
Building survey |
|
Buildings archaeology |
Buildings not sites |
Business management consultant |
|
Certificate of lawfulness |
|
CGI |
|
Civil procedure rules |
|
Climate change |
|
Code of Measurement Practice |
SDS
|
Coefficeint of performance |
|
Co-heating tests |
|
Common law |
|
Commons Act |
|
Community rights inquiry |
|
Component (BIM) |
|
Computer-Aided Facility Management |
|
Condition surveys |
|
Conservation |
|
Constraints |
|
Construction cost |
|
Contract award |
|
Corporate finance |
SDS |
Cost indices |
And tender price indices |
Cost of building |
|
Cost Value Reconciliation (CVR) |
|
Covenant |
|
Debris netting |
|
Decibel |
|
Densification |
|
Derogations |
|
Design coordination |
|
Design co-ordinator |
|
Design data |
|
Design intent |
|
Design management | |
Design team meeting |
|
Detailed services design |
|
Detailed structural design |
|
Determination |
|
Devolution |
|
Discounted Cash Flow (DCF) |
|
Disposal |
|
Ductwork |
CW |
Due diligence |
Technical due diligence exists |
Economic development |
|
Emmerson Report |
|
End of stage report |
|
Energy / energy efficiency |
|
Enterprise and Regulatory Reform Act 2013 |
SDS |
Environmental impairment liability insurance |
|
Equal opportunities |
|
European Union |
SDS |
Fabric structures |
History and fabrics exist |
Factories Act |
|
Faster Building for Commerce, National Economic Development Office (NEDO) Report |
|
Faster Building for Industry, National Economic Development Office (NEDO) Report |
|
File formats (BIM) |
|
Financing structure options |
|
Fire engineering consultant |
|
Fire officer |
|
Firefighting shaft |
SDS |
Flexibility |
Design |
Floating screed |
|
Floor loading |
|
Freedom of Information Act |
|
Furniture, fixtures and equipment (FF&E) consultant |
|
Glazing |
|
Global Unique IDs (GUIDs) |
|
Green building |
|
Green rating systems |
|
Ground works |
|
Guarantees |
|
Heave | MB |
Hedging |
|
Heritage |
|
High street (planning and policy) |
SDS |
Historic buildings inspectors |
|
Hot works |
|
Housing shortage |
|
Housing standards |
|
Inflation |
Fluctuations exists |
Information and communications technology (ICT) consultant |
|
Integrated systems. |
|
Integrated transport systems |
|
Investment |
|
Key dates (in NEC construction contract) |
|
Knowledge management |
|
Landlord |
|
Landscape design |
|
Large Industrial Sites, National Economic Development Council (Report) |
|
Layer (BIM) |
|
Leasebacks |
|
Leases |
|
Liability |
|
Lift motor room |
|
Lighting |
|
Lighting designer |
|
Loads |
Types of load |
Loan criteria |
|
Local Democracy, Economic Development and Construction Act |
Amended the HGCR |
Low rise / high rise definition |
|
Maintenance |
|
Material Management Plan |
|
Material procurement |
|
Measurement (quantities) |
|
Mezzanine finance |
|
Milestones |
|
Mood board |
|
Mortgage |
|
National Process Improvement Project |
Planning |
Native file |
|
Negotiated contract |
|
Nesting (BIM components?) |
|
Net Present Value (NPV) |
|
NHBC technical standards |
http://www.theconstructionindex.co.uk/news/view/nhbc-adds-basement-guidance |
Operational policy |
|
Origin (CAD / BIM) |
|
Overheating |
http://comres.co.uk/polls/wsp-parsons-brinckerhoff-overheating-in-homes-survey/ |
Overtime ruling |
|
Patents |
|
Pathology |
|
Phillips Report |
|
Pirelli General Cable Works Ltd v Oscar Faber & Partners |
|
Planned Preventative Maintenance (PPM) Calendar, |
|
Planning act |
|
Post completion insurance |
|
Practice management |
|
Price |
|
Programme consultant |
|
Progress (regular and diligent) |
|
Project-based funding |
|
Property / land valuation |
|
Property investment market |
|
Proprietary information |
|
Protected stairway |
|
PVC |
|
Quality |
Disambiguation and general introduction to existing articles |
Quality assurance |
Quality control exists |
Recycling |
|
Reduce, reuse and recycle |
|
Refacing stone |
|
Refurbishment |
|
Relocation |
|
Remediation |
|
Renovation |
|
Rent |
|
Resilience |
|
Retrofitting |
|
Re-use / recycling |
|
Right of light indemnity insurance |
|
Rights of light surveyor |
|
Risk assessment under The Regulatory Reform (Fire Safety) Order 2005. |
|
Safety briefings |
http://www.hse.gov.uk/construction/lwit/assets/downloads/communications-toolbox-talks.pdf |
Security consultant |
|
Setpoint |
|
Settlement | In terms of subsidence |
Shear | |
Site meeting |
|
Smoke damper |
See fire damper and approved document b2 definition |
Sources of finance |
|
Space planning |
Office space planning exists |
Special licences |
|
Special parliamentary procedure |
|
Statutory fees |
SDS |
Statutory instruments |
|
Statutory site registers |
|
Structures |
|
Summary judgement |
|
Supplier assessment forms |
|
Surety |
|
Suspension (of the works) |
|
System (BIM) |
|
Tenants |
|
Tender appraisal report |
|
Tender settlement meeting |
|
Tolerances |
|
Town and Country Planning (Local Planning) (England) Regulations 2012 |
|
Town planning |
|
Transport / traffic |
|
Transport/traffic engineer |
|
Urban design |
|
Utilities connection |
|
Valuation |
|
Vendor surveys |
|
Vernacular |
|
Views |
London View Management Framework already exists as does rights to light |
Vomitory |
|
Wall plate |
|
Walltie |
|
Warranties |
Collateral warranties exists |
Water Bill |
|
Weephole |
|
Wind catcher |
|
Wind turbine / wind farm |
|
Wood Report |
|
Workplace definition |
|
World heritage site |
|
Yield |
|
Zone (BIM) |
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.