Build operate transfer BOT
[edit] Introduction
A build, operate and transfer (BOT) contract is a project delivery model that is typically used for large projects developed through Public Private Partnerships (PPPs). The term 'Public Private Partnerships' refers to a very broad range of partnerships in which the public and private sectors collaborate for some mutual benefit.
Under a BOT contract, a private organisation undertakes to complete a project, such as an infrastructure project, for which they are granted a concession to finance and build by a public sector partner, typically a government department. The public partner may provide limited funding or other benefits (such as tax exemptions) but the private organisation accepts most of the risks.
The private organisation is then granted the right to operate the project for a specific period of time and they receive a concession for that.
[edit] Applications
This form of arrangement is used in some parts of the United States and in other regions of the world.
One early example of the method is the China Hotel in Guangzhou, Guangdong, China. Completed in 1984, the five-star hotel was delivered under a DOT arrangement between the local Guangzhou municipal government and several foreign entities. It was the first venture with foreign investment and management in China.
One of the leading sources of funds on the project, Hopewell Holdings Ltd of Hong Kong, operated the property for a fixed period of time upon its completion. In 1998, Marriott took over management of the property through to 2018. After that point, the ownership and management of the hotel was taken over by Guangzhou Lingnan International Enterprise Group Co. Ltd.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.