Target emission rate TER
The Building Regulations set out requirements for specific aspects of building design and construction. Regulation 26 of the building regulations states that 'where a building is erected, it shall not exceed the target CO2 emission rate for the building…'.
The target CO2 emission rate (TER) sets a minimum allowable standard for the energy performance of a building and is defined by the annual CO2 emissions of a notional building of same type, size and shape to the proposed building. TER is expressed in annual kg of CO2 per sq. m.
The CO2 emission rate of the proposed building is calculated based on its actual specification and is expressed as:
- Dwelling emission rate (DER) for self-contained dwellings and individual flats (excluding common areas). This is the annual CO2 emissions of the proposed dwelling expressed in kg/sq. m.
- Building emission rate (BER) for buildings other than dwellings. Again this is the annual CO2 emissions of the proposed building expressed in kg/sq. m.
The DER or BER for the proposed building must not exceed the TER.
Before construction begins, a design stage calculation must be issued to the Building Control Body (BCB), setting out the TER, and BER or DER for the proposed building, along with details of its proposed specification.
Within 5 days of the completion of the construction, a report must be issued to the Building Control Body (BCB), setting out the TER, and BER or DER of the completed building, along with any changes that have been made to the specification, and an energy performance certificate (EPC). These ‘as-built’ calculations require that an air-permeability test is carried out to ensure that the building envelope has been constructed to a suitably high level of workmanship so that air (and with it, heat) will not ‘leak’ through the building fabric. In addition, the BCB is likely to require a commissioning notice.
For buildings other than dwellings, the TER and BER can be calculated and the EPC produced by following the National Calculation Method (NCM). This can be done by using approved simulation software (Approved Dynamic Simulation Models (DSMs)) or by using the Simplified Building Energy Model (SBEM), a ‘simplified’ compliance tool developed by BRE, which has a user interface called iSBEM.
For dwellings, the Standard Assessment Procedure should be followed. This can be done by using a computer program approved for SAP calculations by BRE on behalf of the government.
NB: 2013 changes to part L of the building regulations which came into force on 6 April 2014 introduced a Target Fabric Energy Efficiency (TFEE) rate for dwellings to sit alongside the Target Emission Rate. The TFEE is the minimum energy performance requirement for a new dwelling. The Dwelling Fabric Energy Efficiency (DFEE) rate is the actual energy performance of the new dwelling. The DFEE must not exceed the TFEE.
See Target fabric energy efficiency rate for more information.
[edit] Related articles on Designing Buildings Wiki
- Air permeability testing.
- Approved documents.
- Building performance metrics.
- Building regulations.
- Carbon dioxide.
- Carbon emissions.
- Carbon ratings for buildings.
- Climate change science.
- Energy Savings Opportunity Scheme.
- Energy targets.
- Fabric Energy Efficiency Standard FEES.
- Global warming and the tipping point precipice.
- How can engineers make use of the government’s climate projections report?
- Limiting fabric parameters.
- National Calculation Method.
- Reducing UK emissions: 2018 Progress Report to Parliament.
- Simplified Building Energy Model.
- Standard Assessment Procedure.
- Target fabric energy efficiency rate.
- Why the UK needs to support emerging tech like energy storage.
[edit] External references
- Planning portal: Approved document L.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments