Equipment installed in buildings
The article relates to equipment installed in buildings. For equipment used in construction works, see: Equipment used to construct buildings.
It is important to identify equipment that will be provided within the main contract and equipment which, whilst it may be provided outside of the main contract (because the client may already have the equipment, or they may have existing suppliers) might have an impact on the main contract (perhaps needing to be accommodated in a certain location, or requiring fixing, power supply, air supply, water, drainage, telecommunications connection, etc.).
Equipment requirements might include:
- Built in equipment requiring mechanical or electrical connections such as fume cupboards or drinks stations. A description of built in equipment should include; location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Built in equipment that does not require services such as cupboards or shelving. These should be described in terms of their location and size.
- Stand alone loose furniture and equipment requiring services, such as washing machines, coffee machines and scanning equipment in hospitals. These should be described in terms of their location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Stand alone loose furniture and equipment not requiring services such as tables and chairs. These should be described in terms of their location and size.
[edit] Related articles on Designing Buildings Wiki
- Chattels.
- Commissioning.
- Compressed air plant.
- Concreting plant.
- Construction plant.
- Construction tools.
- Crane regulations.
- Debris netting.
- Earth-moving plant.
- Excavating plant.
- Fittings.
- Fixtures.
- Industrial plant and construction operations.
- Packaging.
- Plant room.
- Power float.
- Procurement route.
- Room data sheet.
- Sanitaryware.
- Specification.
- Tender.
- Tender documents.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.