Bulk filling materials
The term ‘fill’ refers to material used to artificially raise existing ground levels. Bulk filling materials typically include soil, rocks and aggregates and coal ash.
Soil is used for example, for the formation of embankments and other areas of landscape that require fill. It is common to 'cut' soil from the high points of a site and place it in layers in lower areas, in a process known as 'cut and fill'. For more information see Cut and fill.
The soil used for bulk filling must be suitable to remain stable in the long-term. Examples of unsuitable soil material for filling includes:
- Soil from swamps, bogs and marshes.
- Perishable material such as peat, logs and stumps.
- Frozen materials.
- Materials having a liquid limit exceeding 80 and/or a plasticity index exceeding 50.
See also: Types of soil.
Rock fill consists of hard material of a suitable size for compaction and may include crushed stone, hard brick, concrete or other hard inert material. For more information, see Aggregate.
Coal ash is a material obtained from coal-fired power stations. For more information, see Coal ash.
Cellular Concrete (Foamed Concrete) has the advantages that it does not require compaction, does settle over time and it can be re-excavated at a later date if necessary. Large amounts can be placed quickly through small openings, so it is often used for emergency void filling, for example, following the appearance of sink holes or an underground tunnel collapse.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.