Tempered glass
Tempered glass (sometimes referred to as toughened glass) is a type of safety glass that, when it breaks, shatters into small, relatively even pieces that do not have sharp edges. It can also withstand moderate heat.
It is used in situations where large shards of broken glass could cause a hazard, such as in shower doors, frameless glass doors, phone booths, mobile phone screen protectors, diving masks, and car side windows, or in situations where heat may be present, such as in fireplaces.
It is manufactured by a process of extreme heating and rapid cooling, or by a chemical toughening process, that induces compressive stresses in the surface of the glass and tensile stresses in the body of the glass. The internal portion of the glass remain fluid for longer than the outer surfaces during the manufacturing process. This means that an equal amount of tensile and compressive stresses are formed across the glass which allows it to become in the order of four times as strong as annealed glass.
Heat soaked tempered glass may be used in safety critical situations, such as glass railings. Tempered glass panes are heated to a temperature of around 550 degrees Fahrenheit for a few hours. This causes any unstable nickel sulfide inclusions (imperfections that may cause spontaneous breakage of the pane) to expand disproportionately to the glass, making the glass break. Only glass that has not broken is then used.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.