Primary containment
Containment systems for the prevention of pollution, Secondary, tertiary and other measures for industrial and commercial premises (CIRIA C736), published by CIRIA in 2014, defines primary containment as: ‘The most important means of preventing major incidents involving loss of inventory. It is achieved by the equipment that has direct contact with the inventory stored or transferred such as storage tanks, IBCs (intermediate bulk containers), drums, pipework, valves, pumps and associated management and control systems. It also includes equipment that prevents the loss of primary containment under abnormal conditions, such as high-level alarms linked to shut down systems.'
It suggests that secondary containment: ‘Minimises the consequences of a failure of the primary storage by preventing the uncontrolled spread of the inventory. Secondary containment is achieved by equipment that is external to and structurally independent of the primary storage, for example concrete or earth bunds around storage tanks, or the walls of a warehouse storing drums. Secondary containment may also provide storage capacity for firefighting and cooling water.’
And that tertiary containment: ‘Minimises the consequences of a failure in the primary and secondary containment systems. This is done by providing an additional level of protection preventing the uncontrolled spread of the inventory such as site drainage and sumps, diversion tanks and lagoons, containment kerbing to roadways and parking areas and impervious liners and/or flexible booms. Tertiary containment will be used when there is an event that causes the escape of liquids from the secondary containment through failure or overflow (eg bund joint failure, or firewater overflowing from a bund or escaping from building/warehouse during a prolonged fire).’
[edit] Related articles on Designing Buildings Wiki.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.