Section 104 new sewer adoption
Section 104 of the Water Industry Act 1991 provides a mechanism for newly-constructed private sewers and pumping stations to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
Appropriate information must be provided so that the authority can determine whether the sewer will be suitable for adoption. A Technical Vetting and Administration Fee (TVA) will be payable which is 2.5% of the estimated construction cost.
A Section 104 adoption agreement must be entered into before construction of the sewers begins. A bond is also required which is 10% of the estimated construction cost.
The sewer must be designed and constructed so that it complies with the requirements of sewers for adoption, and the appropriate permissions must be in place. Where connection to the public sewer is required, a sewer connection application must be made under Section 106 of the Water Industry Act.
As-built drawings of the sewer must be provided to the authority.
Once the local sewerage authority is satisfied with the condition of the sewers, they will issue a provisional certificate of completion. The applicant then remains responsible for the maintenance and repair of the sewers for an agreed period (typically 3 to 12 months), after which a final inspection is undertaken. Once any required remedial works have been completed a final certificate of completion will be issued and the bond will be released.
Section 102 of the Water Industry Act, allows the owner of an existing private sewer to apply for the adoption of their sewer.
[edit] Related articles on Designing Buildings Wiki
- Drainage.
- French drain.
- Groundwater control in urban areas.
- Highway drainage.
- Planning for floods.
- Private sewer.
- Public sewer.
- Rainwater harvesting.
- Safe working in drains and sewers.
- Section 102 existing sewer adoption.
- Septic tank.
- Sewer construction.
- Sewerage.
- Soakaway.
- Soil vent pipe.
- Sustainable urban drainage systems SUDS.
- Water engineering.
- Water transfers and interconnections.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.