Winter energy crisis: ECA advice for managing power cuts
Leading electrotechnical and engineering services body ECA has promised to support its Members who may be asked to design and install emergency power systems in the event of emergency power cuts this winter.
Energy providers and National Grid have warned of potential power cuts caused by supply fears following the war in Ukraine. Worst-case government scenarios estimate that energy systems could be severely disrupted for up to a week.
ECA Senior Technical Manager Gary Parker said:
“Because of an unprecedented combination of factors including surging demand, supply concerns, and a cost-of-living crisis, our Members and their clients are facing a tough winter.
“ECA has seen an uptick in Members asking for advice and help reviewing their clients’ systems and recovery plans. We are here to support Members with advice and guidance on how to best design and install additional and stand-by systems that can meet their clients’ needs.
“It is important to remember that the UK’s electricity network is one of the most reliable in the world. However, we must be prepared for all eventualities, and the electrotechnical sector will be on the front line if emergency power cuts do occur.”
Those deemed most at risk for the effects of power cuts over the winter include pensioners, care home residents, and people in sheltered housing, schools, and other buildings which may not have energy contingency plans in place.
Electrical designers and installers are encouraged to visit ECA’s Technical website, where Members can access a wide range of technical guidance notes, bulletins, and the ECA Technical helpline, at eca.co.uk/technical.
This article was issued as a press release and appears on the ECA Today website as "Winter energy crisis: ECA’s advice for managing power cuts" on December 8, 2022
--ECA
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.