[edit] Introduction
The ‘root cause’ is the true or underlying reason why something has happened - usually something that has gone wrong. Finding the root cause enables appropriate action to be taken to prevent a problem from happening again - for example, when a nonconformity report (NCR) is raised. Otherwise, action taken may be focussed on the effect rather than the true cause. Therefore, when undertaking investigations into an incident (whether quality or otherwise), specific attention is given to identifying the root cause.
The ‘5 Whys’ is a very simple but effective way to help determine the root cause of an issue by continually asking ‘why’ until the root cause is identified.
[edit] What is 5 Why’s?
It is not unusual for young children to ask ‘why’ when discussing something. Having been given an answer by the adult, the young child then asks ‘why’ again but this time in relation to the answer given, the adult answers and the child persists asking why again in relation to the next answer and so on. This can be very annoying! However, the child is actually demonstrating the principles of the ‘5 Whys’ very effectively. The child (perhaps unknowingly) is trying to find the basis of the reason for the adult’s decision.
The ‘5 whys’ quality tool is simply a way to delve deeper and deeper into the reasons for what has happened. Each time a question is asked and answered we can refer to this as a ‘level’. When no further answers can be given, theoretically, the ‘root cause’ has been determined.
It is often assumed that asking ‘why’ 5 times allows the root cause to be identified (although this may not always be the case).
Question | Answer | |
Level 1 | Why was the bolt not tightened to the correct torque? | The operative was not aware that the bolt had to be tightened to a specified torque. |
Level 2 | Why was the operative not aware that the bolt had to be tightened? | The operative did not receive information from the supervisor. |
Level 3 | Why did the supervisor not supply information to the operative? | The supervisor did not have the information available. |
Level 4 | Why did the supervisor not have the information available? | The supervisor could not access the network drive system. |
Level 5 (root cause) | Why could the supervisor not access the network drive system? | There was no power due to electrical testing. |
It is important to recognise that an issue may initially appear to be the result of one thing when actually the root cause is very different. It is the root cause that will enable the problem to be solved and prevent it from happening again.
A form to help use the 5 Whys quality tool can be downloaded here.
Original article written by Mike Buss, reviewed by Tony Hoyle on behalf of the CQI Construction Special Interest Group, and accepted for publication by the Competency Working Group on 7 March 2018.
--ConSIG CWG 13:32, 28 Feb 2019 (BST)
[edit] Related articles on Designing Buildings Wiki
- Annex SL
- Change control: a quality perspective
- Compensation event.
- Delay to completion.
- Delay to progress.
- Digital quality management in construction.
- Dispute resolution.
- Disruption claims in construction.
- How to write an inspection and test plan.
- Inspection and test plan.
- International research into the causes of delays on construction projects.
- Lifts and escalators: a quality perspective.
- Mobilisation to site: a quality perspective.
- Relevant event.
- Relevant matter.
- Structural steelwork: a quality perspective.
- Why should quality be important to the construction industry?
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.