Air pressure q50 test
The q50-value over one hour is used to describe the air leakage (or air infiltration rate) of a building envelope at a pressure difference of 50 Pascals (Pa). This standard is related to the rate that air infiltrates the whole envelope of a building when doors and windows are closed thus the volume is calculated to include everything within the envelope or the air tightness line.
This is measured through a q50 pressure test which is carried out by closing and sealing doors and windows and installing a door blower to create a pressure differential of 50 Pa (equivalent to a 5 mm water column) between the inside and outside, to measure the air leakage. The standard (or q50) and the UK building regulations requires a test result which is less than 5m3 of air per hour per m2 of floor area @ 50 Pascals expressed as < 5m3/hm2@50pa. Note that the volume of the building is based on the total volume within the building envelope as opposed to the sum of the volume of all internal rooms as is used for the Passivhaus standard.
[edit] Related articles on Designing Buildings
- Accredited construction details ACDs.
- Air change rates.
- Air permeability testing.
- Air pressure n50 test.
- Air tightness in buildings
- Airtightness of energy efficient buildings.
- Draughts in buildings.
- Energy audit.
- Floor plenum airtightness.
- Indoor air quality.
- Indoor air velocity.
- Passivhaus.
- Site inspections.
- Thermographic survey.
- The history of non-domestic air tightness testing.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.