BREEAM project delivery stakeholders
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, suggests that in relation to BREEAM project delivery stakeholders:
‘The purpose of criterion 1 on page xlvii is to reflect the need to consider the input of all major project stakeholders from the earliest practical stage, to ensure smooth and successful delivery of the project's sustainability objectives. Project delivery stakeholders include the client, the building occupier (where known), the design team and the principal contractor. Contractors' involvement ensures their input in terms of formulating sustainable design solutions, commenting or inputting on the practicality and buildability of (one or more) design solutions and their impact on programming, cost etc. BREEAM recognises that traditionally for some projects, the contractor for the works is not appointed at the early project stages and therefore compliance with this criterion would not be possible. In these instances, to ensure the aim of the criteria is upheld, the criterion is met if a suitably experienced person with substantial construction or contracting experience in projects similar to the proposed works is involved prior to appointment of the contractor. A suitably experienced person could be a contractor appointed as a consultant for this stage or a construction project manager.’
Where criterion 1 states:
‘Prior to completion of the Concept Design (RIBA Stage 2 or equivalent), the project delivery stakeholders meet to identify and define for each key phase of project delivery:
- 1.a: Roles
- 1.b: Responsibilities
- 1.c: Contributions.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.