Building Services Validation
Contents |
[edit] Introduction
The validation of building services is increasingly becoming an essential component of pre-construction packages and tenancy lease agreements. In this article, I intend to explore this fast-growing service and explain the benefits of validation, who benefits from the service and when is the right time to undertake these surveys and inspections.
Building services validation (also known as 'MEP' Validation) can be generally described with 3 C’s, these being-
- Condition,
- Compliance, and
- Capacity.
A report will vary considerably depending on the client and project requirements, but generally the scope of an inspection will include one, or all three of these categories.
A validation report will often be complied with photographic evidence and supporting drawings, notes and test results in accordance with the clients’ requirements. Conclusions will be drawn as to the condition, compliance or capacity of the system/plant with evidence to support the statements within the body of the report, or within the accompanying documents.
[edit] Condition Report
The condition of building services is a common focus of a validation report with a view to advise the client on the level of remedial work that is required to restore an installation to a maintainable condition. This may include advice on the life expectancy of plant, with recommendations for replacement where necessary to aid designers with specifying equipment for refurbishment projects.
Condition reporting should be carried out by competent specialists who can comprehensively test the services and plant against industry standards such as BSRIA, CIBSE and the various electrical regulations. The results should then be scheduled against industry agreed life expectancy guidelines to provide a clear and robust conclusion.
Condition reports are supported by testing the performance of key items of plant, non-destructive testing, and integrity testing amongst many other options to identify possible points of failure. Taking ownership of an installation with unknown faults will likely result in increased maintenance costs and potentially result in significant loss of revenue should failure occur.
[edit] Compliance Report
Compliance reporting is particularly important for clients looking to occupy a space where existing building services are to be retained or altered to suit a new layout or level of occupation. Identifying any non-compliances enables clients to include remedial works into refurbishment contracts and align existing installations with industry regulations.
Key services such as fire detection, emergency lighting, and electrical installations as well as water treatment monitoring are required to be regularly tested to validate insurances and ultimately reduce liability. Compliance inspections may include the verification that an incumbent service provider is adhering to the current requirements for these periodic inspections and maintaining the appropriate documentation, something that should not be taken for granted.
Aside from statutory compliance, validation reports can be used to ensure compliance with performance specifications and original design criteria. Such intrusive inspections range from the measurement of flow rates against design figures for mechanical systems, to reviewing record drawings for an installation, verifying are an accurate representation of the system. This exercise provides huge benefits to Consultants seeking to modify system designs by informing them of the actual site conditions for which they may otherwise have been ambivalent.
[edit] Capacity Report
For clients seeking to extend an existing system, or increase occupation of a space, a key consideration will be the capacity of the building services. Measuring the demand of a system and comparing against the available capacity can provide essential information for future expansion and support budgets/specifications for upgrading supplies or main items of plant.
For example, an increase in the occupation to a typical commercial space will have an impact on the following services (where they are available):
Failing to determine the available capacity of these services will result in costly ramifications post-completion if not identified and addressed at the design stage for the project.
[edit] Risk Management
To ensure risk is managed as effectively as possible, a validation of the building services should be performed as early into the project as possible so that any problems can be identified and incorporated into the specification. For fit out and construction projects, this will be at pre-contract stage after initial conception; where a tenant is seeking to occupy a space, it is advised to carry out intrusive due-diligence inspections prior to signing any lease agreements.
Due to the complex nature of these inspections, it is advised that an independent specialist contractor is engaged to deliver validation reports to ensure an unbiased view of the services, that is compliant with the clients brief. In some cases, incumbent service providers or contractors with an interest in the project are instructed to carry out the inspections and deliver a report, as it would appear to be a cheaper and simpler alternative to an independent specialist. Caution should be applied in such cases as these parties have an interest in the project and may seek to conceal maintenance issues, or condemn otherwise satisfactory systems to inflate the project budget.
[edit] Beneficiaries
The benefits of validation have been recognised by industry experts at all stages of the building services life cycle. Typical industry professionals who save time and money through an increased awareness of building services using validation reports include:
- Design consultancies,
- Project managers,
- Contractors,
- Architects,
- Commercial and retail end users,
- Property consultants,
- Facilities managers,
- High end residential mangers
Jonathan Woodard MIET
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.