Building log book
Part L of the Building Regulations (conservation of fuel and power) requires that the building owner is issued with information about the building services to help them operate the building properly and efficiently. It is suggested that this is done by issuing a building log book to the building's facilities manager. Building log books are required for new buildings and for existing buildings where the services have changed. Whilst not a requirement of the Building Regulations, it is suggested that existing buildings would also benefit from a building log book.
The building log book is different to, but may draw upon, information in the building owner's manual, sometimes called the operation and maintenance manual (O&M manual), and the health and safety file. Unlike the building owner's manual it should be a concise document (20-50 pages for larger buildings and 5-10 pages for buildings under 200 sqm (the Carbon Trust's 'Building logbooks a users guide' page 8). It should be easy to understand, giving an overview of the way in which the building was originally intended to operate and any changes that have been made.
Building log books can be prepared following the guidance in the Chartered Institution of Building Services Engineers (CIBSE) TM 31 Log Book Toolkit.
Building log books may include:
- A description of key responsibilities.
- A schedule of contacts.
- A description of the overall building, including zoning and occupancy.
- A description of the building's operational strategy.
- A description of the building's services plant, controls and management systems.
- Changes that have been made to the building.
- Health and safety considerations.
- Maintenance requirements.
- Metering and monitoring strategy.
- The data used to calculate the TER (target CO2 emission rates) and BER (building CO2 emission rates), see emissions rates.
- The recommendations report produced along with the construction energy performance certificate.
- Building performance in use investigations and targets.
- References to other documents.
Preparation of the building log book should be co-ordinated by the lead designer. It should then be issued to the building's facilities manager at handover. If updates are required during the defects liability period, these will normally be made by the designers. The facilities manager should then take over responsibility for its ongoing development.
The building log book should be reviewed and updated annually by the facilities manager.
In addition to a building log book, it may also be prudent to prepare a non-technical 'building users guide' with information for users about environmental controls, access, security and safety systems etc.
[edit] Related articles on Designing Buildings Wiki
- Asset information model.
- BSRIA Soft Landings 2019 award winners.
- Building manual.
- Building Regulations.
- Building information modelling.
- Building owner's manual.
- Building user's guide.
- Emission rates.
- Energy targets.
- Handover to client.
- Health and safety file.
- Maintenance.
- Soft landings.
- Technical guide.
- U-values.
- Working with maintenance contractors.
[edit] External references
- The Carbon Trust's 'Building logbooks a users guide'.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments