Client requirements
The client's requirements for a project might initially include a vision, mission and objectives for what they wish the project to achieve. They might first be explored by a client when they identify a need which might result in the requirement for a certain equilibrium that has been neutralised and factored into the equation.
A statement of need, might then be prepared which is a first attempt to describe the possible requirements of the project. This may or may not result in the development of a new project.
See Statement of need for more information.
If the project does proceed, the client may then develop their requirements into a strategic brief. Initially, this just describes the client's requirements in sufficient detail to allow the appointment of consultants (such as an architect, engineers and so on). Once consultants are appointed, the strategic brief may be developed further to allow feasibility studies and options appraisals to be carried out.
See Strategic brief for more information.
Once the preferred option for the project has been selected, the strategic brief is typically developed into a full project brief. This is the key document upon which the design will be based.
See Project brief for more information
- The RIBA Plan of Work 2020 suggests that the client requirements are: 'A statement or document that defines the Project Outcomes and sets out what the client is seeking to achieve. It is used to develop the Business Case, which examines any viable options that meet the Client Requirements.' It goes on to suggest that: 'The Client Requirements set out what the client is trying to achieve. For example, two residential clients might have the same Spatial Requirements (say, a new kitchen and an extra bedroom); however, one might be about to sell their property and is looking to increase its sale price while the other has a new baby and wants to consolidate their position close to good local schools. While the Spatial Requirements for both clients are the same, it is unlikely that their desired Project Outcomes will be the same, so a different Business Case and Project Budget is required for each. The Client Requirements allow the project team to explore viable options, determine the pros and cons for each and, ultimately, recommend the option best suited to deliver the Client Requirements. When this recommendation constitutes a project, and it is signed off by the client, the more nuanced and detailed Project Brief can be prepared.'
- The term 'Employer's requirements' refers to the formal client's requirements on design and build projects or on a traditional contract where the contractor is to design discrete parts of the works. See Employer's requirements for more information.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.