Clinker in construction
Broadly, clinker refers to a stony residue resulting from burning coal or from a furnace. It is a common component of aggregates, Portland cement, brickwork, blockwork, paving and so on.
Archaeological Evidence for Glassworking, Guidelines for Recovering, Analysing and Interpreting Evidence, published by Historic England in 2018, describes clinker as: ‘A fused material produced at high temperatures, here used to describe the waste from coal-fired glass furnaces.’
Low Carbon Concrete Routemap, Setting the agenda for a path to net zero, draft for consultation published by the Institution of Civil Engineers in 2021, defines clinker as: ‘A nodular material made by heating limestone and clay at a temperature of about 1,400C-1,500C. It is the basic ingredient of Portland cement, the one that confers hydraulic properties to cement.’
UK Concrete and Cement Industry, Roadmap to Beyond Net Zero, published by MPA UK Concrete in 2020, defines clinker as: ‘the principle constituent of cement, clinker is produced by heating raw materials such as limestone with other materials such as clay to 1450°C. Its manufacture is typically the most energy and emissions intensive part of cement and concrete production.’
The term ‘clinker built’ refers to a method of boat building in which the planks that make up the hull overlap. This is also referred to as lapstrake.
Its originates from the word 'clink' or 'clench', ie clenching together, or fusing.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.