New code of estimating practice
The Code of Estimating Practice was originally published by the Chartered Institute of Building (CIOB) in 1996. It went on to become a highly-respected industry resource, providing an authoritative guide to the principles of, and good practice in, estimating for building work for those involved in procuring and pricing construction works, both in the public and private sectors.
It presents estimating as part of the wider process of commercial management for construction businesses. This is not simply a matter of winning a bid - if the bid is successful, the estimate goes on to form the basis of the contractor’s budget and cost management strategy.
The seventh edition was published in 2009 and included new material on estimating strategy, tendering, procedures and best practice, as well as the build-up of unit rates of cost, overheads and profit, and e-commerce.
In March 2018, it was re-branded as the New Code of Estimating Practice. https://www.wiley.com/en-gb/New+Code+of+Estimating+Practice-p-9781119329640
This new version has been completely rewritten to include more contextual and educational material, and now covers:
- Estimating practice.
- The bidding process.
- The fundamentals in formulating a bid.
- The pre-qualification process.
- Procurement options.
- Contractual arrangements and legal issues.
- Preliminaries.
- Temporary works.
- Cost estimating techniques.
- Risk management.
- Logistics.
- Resource and production planning.
- Computer-aided estimating.
- Information and time planning.
- Resource planning and pricing.
- Preparation of an estimator’s report.
- Bid assembly and adjudication.
- Pre-production planning and processes.
- Site production.
--CIOB
[edit] Related articles on Designing Buildings Wiki
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Chartered Institute of Building.
- All-in rates.
- Contract sum analysis.
- Contract sum.
- Cost consultant.
- Cost control.
- Cost engineering.
- Cost plans for construction projects.
- Elemental cost plan
- Final account.
- Initial cost appraisals.
- Mark-up.
- Measurement.
- New Rules of Measurement.
- Pre-tender estimate.
- Procurement.
- Project overheads.
- Tender documents.
- Top down and bottom up estimating.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.