Collective restraint systems
Collective restraint systems are passive safety systems designed to stop personnel from falling when working from significant heights. Once collective restraint systems have been installed, they do not require workers to take proactive measures in order to be safe. This is why they are considered passive safety measures.
Unlike personal fall arrest or fall prevention systems, collective restraint systems protect numerous workers across a large area. To protect personnel working in high-risk areas, systems should be at least 1.2m high and placed around the perimeter of the area.
Systems can include:
- Guardrails. A guardrail is a longitudinal barrier that prevents people from falling or straying into a dangerous or restricted zone.
- Barriers or guardings. These are structures – either raised rails, parapets or walls – that deny access to unsafe areas
- Purlin trolleys. Purlin trolleys provide workers with a safety deck to walk on and protect them from exposure to edging. They are frequently used in roofing installations.
Some systems are static and do not require removal when they are not in use, but some do not need to be permanently installed and can be disassembled.
If a collective restraint system is not in place, personal fall arrest systems should be used to protect workers in situations where falls are possible.
[edit] Related articles on Designing Buildings Wiki
- Approved Document K.
- Barrier.
- BS 7883.
- BS 7883 guide released.
- Construction (Design and Management) Regulations.
- Fall arrest system.
- Fall prevention systems.
- Guarding.
- Guardrail.
- Injuries on construction sites.
- Personal fall protection system.
- Purlins.
- Railings.
- Safety in high places.
- Safety systems for working at heights.
- Site safety.
- Work at height checklist for managers.
- Work at height regulations.
- Work at height.
- Working at height - our duty to prevent harm and protect each other.
- Working at height training.
[edit] External resources
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.