In very broad terms, the word ‘commencement’ means beginning something. In the construction industry this generally refers to the contractor beginning the construction works, ie the point at which site clearance, demolition, excavation or construction begins. For more information see: Construction operations definition.
Commencement of construction works will be proceeded by activities such as design, procurement and mobilisation, and there may be legal requirements that need to be satisfied, such as obtaining planning permission, satisfying planning conditions or planning obligations, obtaining building regulations approval, obtaining a party wall agreement, notifying the Health and Safety Executive and so on. For more information see: What approvals are needed before construction begins.
In addition, commencement may be required before a certain point, for example, within 3 years of the date planning permission was granted, or within three years from the date of deposit of plans for building regulations approval.
Commencement may also have contractual implications, as the date for possession of the site by the contractor may be set out in the contract. If the client fails to give possession of the site to the contractor, and there are no provisions for delay in the contract, then they will be in breach of contract. Even if the contract does provide for delay in giving possession of the site to the contractor, the contractor may still be able to claim for an extension of time and perhaps loss and expense.
If no date for possession is included in the contract, then the site must be handed over to the contractor within a reasonable time after signing of the contract.
On commencement of the works, the contractor may become responsible for insurance, security of the site and so on, and may be obliged to progress regularly and diligently with the works, or to achieve certain key dates.
The term ‘commencement’ might also be used to refer to the commencement of an appointment, the commencement of a contract, commencement of legal proceedings and so on.
NB There is currently no legal UK definition of (as opposed to guidance on) "commencement" for the purposes of the building regulations. Knowing whether work has commenced will be critical to understanding whether approval has lapsed and/or whether work benefits from transitional provisions. Consequently, a legal definition of "commencement" is being considered.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.