Default in construction contracts
The CCRs 2013 UK Legislation 3134/2013 refers to Default. This default has a different meaning from 'defaulting' here, defined as a breach of contract.
The 'default' in CCRs 3134/2013 is an addition to the invoice which is automatically added without consent from the consumer. Default means the additional charge is continuously in operation, such that the consumer is opted-in to the charge by the trader without consent being received by the trader.
This might be an optional service charge percentage for good on-time work, added by coding the accounting system. The regulation requires express consent to have been received by the trader before the consumer is bound by the contract.
This 'default' in CCR 3134/2013 article 40 is not the same as here - to default, to fail to pay.The following paragraphs refer to 'fail to pay'.
A default is a non-material breach of contract, whereby one party fails to perform a contractual obligation. What specifically constitutes a default will be set out in the contract terms, but generally, it can be defined as an omission or a failure to do what is expected or required.
If one party defaults, the other party may make a claim for damages, but may not consider it is discharged from any further obligations under the contract. This prevents the innocent party from avoiding their overall obligations because of a minor breach of just one part of the contract.
This is different from a serious, material breach of contract (although the distinction is not clear cut) which may allow the innocent party to consider that they are discharged from any further obligations under the contract.
NB This use of the term default differs from its use with regard to a debt, which is when a debt has not been paid by its due date.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.