Design build finance and operate
An example of a design build finance and operate procurement route is a public private partnership (PPP), the most common form of which is a private finance initiative (PFI) project (ref. HM Treasury Public private partnerships).
A single contractor (perhaps a special purpose vehicle (SPV), with design, construction and facilities management expertise as well as funding capability) is appointed to design and build the project and then to operate it for a period of time. The contractor finances the project and leases it to the client for an agreed period (perhaps 30 years) after which the development reverts to the client.
As this is a very long-term relationship, entered into before any design work is undertaken, it is extremely important that the client defines their requirements very carefully, in particular the quality that is required and how it will be judged. A great deal of risk is given to the contractor, however the price they offer will reflect this.
PFI is one of the three procurement routes favoured by the Government Construction Strategy for central civil government projects.
Variations include: design build operate (DBO), and build, own, operate, transfer (BOOT).
In 2011, two government reports concluded that PFI contracts have not been a good use of taxpayers money, suggesting that PFI cost five times more than conventional government procurement. The banks, funding institutions and professions have not been prepared to take the risk associated with PFI projects, and it has instead been transferred to the building contractors and operating companies which have offered high prices in return.
The attraction to government is that PFI projects do not appear on the balance sheet, albeit piling up debt in the public sector with as much as twenty five year commitments. The recommendation of the reports is that in future PFI liabilities should be shown on treasury accounts. This may reduce this type of government contracting in the future.
For a detailed description of the sequence of activities necessary on a PFI contract see the free work plan: Public project: outline work plan.
[edit] Related articles on Designing Buildings Wiki
- Build, own, operate and transfer (BOOT).
- Design and build.
- Design and build - pros and cons.
- Design, build, finance, maintain DBFM.
- Design Build Finance Operate Maintain DBFOM.
- Design Build Finance Transfer (DBFT).
- Design build operate (DBO).
- Design Build Operate Transfer DBOT.
- Design construct manage finance DCMF.
- Government Construction Strategy.
- Infrastructure UK.
- PF2.
- Procurement route.
- Private Finance Initiative.
- Public Private Partnership.
- Public procurement.
- Renovate, operate, transfer (ROT).
[edit] External references
HM Treasury PFI / PPP guidance. 25 July 2013.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments