Design team meeting
Contents |
[edit] Introduction
Design is a process of creating a solution to a brief and then preparing instructions allowing that solution to be constructed. Design is an iterative process, where, at each iteration, there are inputs, there is a design process and then there are outputs.
Building design is typically multi-disciplinary, involving a number of different designers, such as architects, engineers and so on, working together to create a single, holistic solution. Design teams typically start as a relatively small group, but as the design progresses, there is an ever-greater need for specialist input, and so design teams can develop to become large and complex. This is increasingly the case given the complexity of the supply chain in the modern construction industry.
It is important therefore that design teams are properly organised and coordinated so it is possible to integrate designs prepared by different members of the team to create a single set of unified information. This process of organisation and co-ordination will generally include the need for regular design team meetings.
[edit] Organisation
Design team meetings are typically coordinated by the lead designer, if one has been appointed, and may include all, or part of the design team. Sub meetings may also be organised to deal with specific aspects of the design, such as the structure, building services and so on.
Design team meetings will generally be restricted to those issues specifically to do with the developing design, and will only be attended by members of the design team. Other issues are better dealt with at wider, project team or progress meetings which might also involve project managers, the client or their representatives and so on.
Depending on the stage of the project, the number of attendees and the issues that need to be considered, design team meetings can be very structured, or they can be more creative. In either case, it is important that they are properly organised, with an agenda sent out well in advance so that participants know what will be expected from them, and that they are minuted so that any actions or decisions are captured and can be followed up. They should be scheduled so that appropriate decisions can be made and work coordinated to meet the project programme.
There may be outputs from design team meetings, such as reports to the lead consultant, project manager or client, requests for information, requests for approvals, instructions to contractors and so on. Other parties may also have to be consulted regarding the progress of the design, such as users of the building, neighbours, the local planning authority, the building control body and so on.
[edit] Agenda
Very broadly, depending on the stage of development of a project and the issues that need to be considered, an agenda for a design team meeting might include:
Agreement of the minutes of previous meetings.
Organisation:
- Appointments and personnel.
- Roles and responsibilities.
- Communications and reporting procedures.
- Standard methods and procedures for drawings, computer aided design or building information modelling.
- Programme and progress.
Design development:
- Client's requirements.
- Development of the brief.
- Site information, surveys and constraints.
- Feedback from consultations.
- Reports from designers.
- Design options and issues.
- Specific technical issues.
- Outstanding issues.
- The need for additional information or studies.
- Coordination issues.
- Reporting.
- Next steps.
Approvals:
- Planning permission.
- Building Regulations.
- Funders, insurers and so on.
- Legal issues.
Any other business.
Date of next meeting.
[edit] Related articles on Designing Buildings Wiki
- Appointing consultants.
- Collaborative practices.
- Consultant team start-up meeting.
- Design co-ordination.
- Design management plan.
- Design management.
- Design manager.
- Design methodology.
- Design responsibility matrix.
- Design review.
- Design team.
- Information manager.
- Lead designer.
- Specialist contractors start-up meeting.
- Team behavioural roles.
- Team management.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.