Determination in construction contracts
The term ‘determination’ in relation to construction contracts typically relates ending the contractor’s employment under the contract. Contracts may provide for determination of the contractor’s obligations under the contract by the employer or the contractor if there is a breach of contract by the other party. This may happen if one of the parties has ceased to perform their obligations under the contract, for example, if the contractor is no longer proceeding regularly and diligently with the works. However, the contract itself remains in place, and so do the rights of both parties.
This is as opposed to the termination of the contract, which brings the contract itself to an end. This may happen, for example, if one of the parties to the contract behaves in such a way that it indicates it no longer intends to accept its obligations under the contract, this is considered to be a repudiatory breach (or fundamental breach) allowing the innocent party to terminate the contract and to sue for damages.
For more information, see Repudiatory breach in construction contracts and Termination.
The word determination may also refer to determining the outcome of an assessment, such as expert determination, determination of approval for building regulations applications or planning applications and so on.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.