Development Management Procedure Order
The Town and Country Planning (Development Management Procedure (England)) Order 2015 consolidates the Town and Country Planning (Development Management Procedure) (England) Order 2010 and 15 subsequent amending instruments. In addition it makes a number of key changes to the process for handling the planning application process.
The 2015 order sets out the procedures that should be followed in relation to:
- Planning applications.
- Planning application consultations.
- The determination of planning applications.
- Appeals.
- Local development orders.
- Certificates of lawful use or development.
- The maintenance of planning application registers.
Some of the main changes introduced by the Order are set out below:
- Clarification of information requirements that must accompany a planning condition (Article 27): In addition to earlier requirements, this now specifies that drawings, plans and “such particulars...as are necessary to deal with the application” must be submitted.
- Deemed discharge of planning conditions (Articles 28, 29, 30 and Schedule 6): The Town and Country Planning Act 1990 provides for the deemed discharge of planning conditions to be prescribed through a development order. Articles 28 and 29 describe the process for the discharge notice with Article 30 and Schedule 6 governing those conditions that are exempt from the deemed discharge procedure.
- Written justification for pre-commencement planning conditions (Article 35): The planning authority now must fully justify any cases where a pre-commencement condition is required.
- Variations to statutory consultation (Schedule 4): There are changes to the requirements for consultation with Natural England, Historic England, the Highways England, the Garden History Society, water and sewerage undertakers and local flood authorities.
An Explanatory Memorandum has been published by the government.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki.
- Consultation process.
- Deemed discharge of planning conditions.
- Design and access statement.
- Highways England.
- Historic England.
- Lawful development certificate.
- Local development orders.
- Natural England.
- Planning appeal.
- Planning conditions.
- Planning permission.
[edit] External references
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.