Window and door schedules
In its broadest sense, the term ‘schedule’ simply refers to a list. That can be a list of items, activities, events, information, and so on. Schedules may be appended to other documents, such as contracts.
Window and door schedules are a convenient way of presenting complex information about the different door and window sizes and types that are specified on the contract documents to ensure proper installation. Drawings may refer to window and door schedules by use of a code corresponding to a door or window type on the schedule.
A door schedule is a document, which has all the information a joiner will require in selecting the correct door for a designated position, as well as the correct ironmongery that has to be fitted to each door
Typical information contained on a door schedule might include:
- Code number (which corresponds with the drawings).
- Name.
- Style.
- Number required.
- Size (width, height, thickness).
- Material.
- Composition.
- Colour and finish.
- Style of hardware.
- Hinges, locks, handles, push plates, pull handles, kicker plates, vision panels, stops, closers and so on.
- Weight.
- Fire rating.
- Acoustic rating.
- Manufacturer.
- Product series.
- Other remarks.
Schedules may also include a simple elevation illustrating the overall composition of the door or window.
Building information modelling (BIM) software may allow door and window schedules to be generated automatically.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.