ECA welcomes Government battery storage response
ECA has welcomed Government's announcement that electrical battery storage systems will be subject to VAT relief when either retrofitted to a qualifying energy saving material, or installed as a stand alone technology connected to the grid.
The move represents a significant win for ECA. It follows ECA's lobbying efforts to better align policy with Net Zero targets. Learn more about ECA's work in this area, here.
A statement issued buy HMRC reads:
"The government recognises the integral role that electrical battery storage can play in reducing households’ reliance on the grid, both when retrofitted to a qualifying ESM and when used as a stand alone technology connected to the grid."
"This technology already qualifies for VAT relief when installed alongside a qualifying ESM, as it is ancillary to a zero-rated supply. The government agrees with respondents, though, that this technology meets all of the stated objectives for this VAT relief in its own right, and will therefore bring electrical battery storage within the scope of the relief. This means that the technology will now also qualify for VAT relief when either retrofitted to a qualifying ESM, or installed as a stand alone technology connected to the grid."
"The government hopes this reform will enable more consumers to retrofit electrical battery storage to existing ESMs, allowing households to maximise the efficiency of their solar panels, wind turbines, and water turbines. Government response. The government recognises the integral role that electrical battery storage can play in reducing households’ reliance on the grid, both when retrofitted to a qualifying ESM and when used as a stand alone technology connected to the grid. This technology already qualifies for VAT relief when installed alongside a qualifying ESM, as it is ancillary to a zero-rated supply."
Read the full outcome of the consultation here.
[edit] Related articles on Designing Buildings
- Battery energy storage systems with grid-connected solar photovoltaics BR 514.
- Battery storage.
- DC isolators for photovoltaic systems (FB 68).
- Domestic micro-generation.
- Energy price crisis: ECA calls for energy levy reform.
- Energy storage - the missing piece?
- Energy storage for buildings.
- Energy storage in buildings - a technology overview BG73 2018.
- Flow battery.
- Fly wheel.
- Fuel cell.
- Graphene batteries.
- Lead-acid battery.
- Lithium-ion battery.
- Tax relief.
- The use of batteries to store electricity for buildings.
- Types of battery.
- VAT
- VAT - Option to tax (or to elect to waive exemption from VAT).
- VAT - Protected Buildings..
- Why the UK needs to support emerging tech like energy storage.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.