Emerging cost contract
Emerging cost (Time and Materials (T&M)) contracts are most commonly used for rail infrastructure projects.
They are essentially cost reimbursable management contracts for a programme of works and services where the management contractor is paid direct costs identified in an 'estimate of project costs'. They provide for sophisticated management services along with sub-contracting the construction of the works.
However, while there may be target costs and schedules of rates for individual items of the programme of works, with associated incentives and penalties, there is no overall target cost. This means that the final value of the contract may not be known until the contract is complete. This can be useful where setting an overall target cost would restrict the client’s ability to vary the scope of works.
This means the client is accepting many of the financial risks of the project, and must have the expertise and appropriate controls to manage those risks.
Emerging cost contracts provide for value engineering and for the right to terminate if the cost estimate reaches an agreed percentage above the original estimate.
Emerging cost contracts are often applied over a defined period of time. The longer this period of time, the more consideration the contractor is likely to give to long-term performance issues in design and workmanship.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.