Emley Moor transmitting station
Emley Moor transmitting station, officially known as The Arqiva Tower, is a telecommunications and broadcasting facility on Emley Moor, in Kirklees, West Yorkshire.
With a height of 330.4 m (1,084 ft), it is the tallest freestanding structure in the UK, the seventh tallest in the European Union, and the 24th tallest tower in the world. It is 20.8 m taller than The Shard, which is popularly thought to be the tallest structure in the UK.
Designed by Arup, the structure consists of a tapered cylindrical pillar of reinforced concrete, topped by a steel lattice mast carrying 55 m (180 ft) tall antennas.
The current tower is the third such structure to have occupied the site. The original lattice tower was built in 1956 and measured 135 m (443 ft) tall. It was used to broadcast ITV to the Yorkshire area. In 1964, it was replaced by a guyed mast measuring 385.5 m (1,265 ft).
In March 1969, the structure collapsed as a result of strong winds and the weight of ice that had formed around the top of the mast and on the guy wires. The subsequent committee of inquiry blamed the collapse on a form of oscillation which occurred at a low but steady wind speed.
The construction of the current tower was begun in 1969 and was completed in 1971. It is built on foundations which extend 6 m (20 ft) into the ground. A control room at 274 m (900 ft) can be reached by a lift that takes around 7 minutes to ascend.
In 2002, English Heritage (now Historic England) granted the tower Grade II listed building status due to its ‘significant architectural or historic interest’.
In recent years, the tower has had supporting structures attached to accommodate more dishes and aerials, reflecting the changing nature of communications and technology.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.