Environmental Impairment Liability (EIL)
The EU Environmental Liability Directive aims to make businesses Europe-wide responsible for the full consequences of environmental damage they may cause. This includes damage to protected species and habitats, underground water sources or groundwater, and land where there may be a human risk-factor.
Environmental Impairment Liability (EIL) is a form of insurance cover available for liabilities associated with environmental damage or pollution. Contractors that may be at risk from losses associated with damage or pollution caused by their activities may purchase EIL policies, and cover may be a requirement of a construction contract.
EIL can provide comprehensive cover for the construction phase of a project:
- Potential claims from regulatory bodies and third parties.
- Liabilities arising from the EU Environmental Liability Directive (not restricted solely to damage from pollution incidents).
- Onsite clean-up costs as required by legislation.
- Third party claims such as bodily injury, property damage, nuisance and trespass, and clean-up costs.
- Clean-up costs incurred by regulators.
- Incident response requiring emergency expenditure.
- Costs and expenses for investigations, legal defence and so on.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Collateral warranties.
- Contaminated land.
- Contractors’ all-risk insurance.
- Design liability.
- Environmental Liability Directive.
- Future proofing.
- Insurance for building design and construction.
- Integrated project insurance.
- Planning for floods.
- Professional Indemnity Insurance.
- Residual value insurance.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.