Failure of cast iron beams
Many buildings utilising cast iron (CI) continue to give good service with adequate reliability when used in a risk assessed manner and current best practice documents. As is normal with this type of beam, there is rarely any apparent warning of imminent collapse.
Certain combinations of actions may lead to an unsafe situation that should be investigated by a competent structural engineer. These situations include:
- Additional loading on a CI beam, typically arising from further deadweight added since original completion. The unregulated increase of load on a structure should always be a matter of concern.
- Long-standing ingress of water leading to corrosion, deterioration of the concrete infill, and loss of any composite action. Extended basements or roof garden arrangements are particularly prone to this action.
- The beams working at high levels of stress as originally installed. This is more likely in a domestic structure where the beam may have been sized by rule of thumb.
Professionals working in this field, or with clients responsible for property of this type and era, should be aware of these issues and be ready to advise the relevant parties of the need for a structural risk assessment if the identified conditions exist.
[edit] Related articles on Designing Buildings Wiki
- Brittle fracture.
- Cast iron.
- Conservation of Architectural Ironwork.
- Defects in construction.
- Degradation of construction materials.
- Failure of metals.
- Flat roof defects.
- Girder.
- Graphitisation.
- Iron.
- Metal.
- Roofing defects.
- Rust.
- Structural failures.
- Structural steelwork.
- Tension.
- Weathering steel.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.