Feed-in tariff FIT
Our society is heavily dependent on fossil fuels such as oil, gas and coal, and is likely to remain dependent on them for much of this century. Every year we emit more than 20 billion tonnes of carbon into the atmosphere by burning fossil fuels, half of which is absorbed in the seas and by vegetation, and half of which remains in the atmosphere.
The impact on human and natural systems is potentially irreparable. In addition, as fuels deplete and demand increases, so supplies become more vulnerable to disruption.
The feed-in tariff scheme was introduced by the Government's Department for Energy and Climate Change (DECC) on 1 April 2010. Consumers who generate their own electricity from a renewable or low-carbon source can qualify for a payment (‘Feed-in Tariff’ (FIT)) for each unit of electricity generated.
Allowable technologies are:
- Solar photovoltaic panels.
- Wind turbines.
- Water turbines.
- Anaerobic digestion (biogas energy).
- Micro combined heat and power (micro-CHP).
The installation must have a peak output of no more than 5 megawatts (MW) and must be installed by a certified installer.
The feed-in tariff rate varies depending on:
- The size of the system.
- The generating technology.
- The installation date.
Consumers can also qualify for an ‘export tariff’ by selling surplus electricity back to their supplier. This is estimated as being 50% of the electricity generated for most domestic systems.
The tariffs paid depend on the eligibility date, and for solar photovoltaic panels, if the property’s energy performance certificate (EPC) rating is below ‘D’, then either additional energy saving measures must be taken before solar photovoltaic panels are installed, or a lower tariff will be paid.
Tables showing the latest tariffs are available on the Ofgem website.
NB: On 9 September 2015, following consultation, the government announced that they would remove pre-accreditation for all new participants in the Feed-in Tariff scheme from 01 October. Pre-accreditation allows a developer to lock in the subsidy rate well before major construction work or installation to acquire the necessary planning and environmental permits and grid connections has been completed.
This means that although the subsidy level may have reduced by the time electricity begins to be generated, the developer will receive the higher subsidy agreed when the plant was in the planning stage. Ref gov.uk.
NB: On 31 March 2019, the United Kingdom's Feed-in tariff was discontinued for new applicants. See Smart Export Guarantee SEG.
[edit] Related articles on Designing Buildings
- CHP.
- Domestic micro-generation.
- Electricity supply.
- Energy performance certificates.
- Energy storage - the missing piece?
- Geothermal piles.
- Green deal.
- Green Deal Home Improvement Fund.
- Ground energy options.
- Ground source heat pumps.
- Large scale solar thermal energy.
- Making the most of renewable energy systems DG 531.
- Microgeneration.
- Microgeneration certification scheme.
- Microgeneration Certification Scheme 2020.
- Micro-CHP.
- Micro-grid.
- On site.
- Private wire arrangement.
- PV inverter.
- Renewable energy.
- Renewable heat incentive.
- Smart Export Guarantee SEG.
- Solar photovoltaics
- Solar thermal systems.
- Wind Energy in the United Kingdom
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.