First aider
Contents |
[edit] Introduction
A first aider is a person that has undertaken necessary first aid training and holds a valid qualification as proof of competence. First aiders are important on construction sites as they can provide help and assistance should there be an injury or illness.
Common injuries that first aiders may have to deal with on site include:
- Electric shock.
- Falls from height.
- Injuries from building materials, plant and equipment.
[edit] Qualifications
The qualification must be one that the Health & Safety Executive (HSE) recognise. This can be either:
- First aid at work (FAW), a higher level 3-day course which also covers first aid to specific injuries and illnesses.
- Emergency first aid at work (EFAW): Usually a one-day course covering emergency first aid.
First aiders should take one or both courses from a training organisation that is approved by HSE or a recognised awarding body of Ofqual/Scottish Qualifications Authority. It is recommended that first aiders undertake annual refresher training to ensure their basic skills are up to date. Certificates last for three years, and before expiring a requalification course should be undertaken by the first aider.
[edit] Number of first aiders
Although there are no exact rules or requirements on the number of first aiders for a construction site, the Health and Safety (First Aid) Regulations 1981 require all construction sites to have:
- A first aid box with the necessary equipment for the number of on-site workers.
- Clear information provided, usually in the site facilities, giving the name of the appointed person or first aider and where to find them.
- An appointed person responsible for first aid arrangements.
Since there are no specific requirements, each construction project should be assessed on the basis of its first aid needs. This will be influenced by the number of operatives on site, the type of working conditions, the type of materials being used, and the construction procedures being undertaken.
The HSE provides guidance on the number of first aiders:
- Less than 5 people on site: At least one appointed person.
- 5-50 people on site: At least one qualified first aider trained in EFAW or FAW.
- More than 50 people on site: At least one first aider trained in FAW per 50 operatives.
First aid personnel should be available at any time that work is being done on site. If work is being done in shifts, then a project may need two qualified first aiders to handle the separate shift work.
[edit] Appointed person
The appointed person is responsible for first aid facilities, equipment, and procedures, although unlike first aiders they do not require first aid training. The appointed person is also responsible for calling the emergency services when required.
[edit] First aid kit
As a minimum, a site first aid kit should contain:
- A leaflet giving general guidance on first aid.
- Sterile plasters (assorted sizes) appropriate to the type of work.
- Sterile eye pads.
- Triangular bandages.
- Safety pins.
- Sterile unmedicated wound dressings.
- Disposable gloves.
Although there is no specific timeframe, many items, particularly sterile items, have expiry dates and should be disposed of and replaced accordingly.
British Standard BS 8599 provides further information on the contents of first aid kits.
[edit] Related articles on Designing Buildings
- Accident book.
- Automated external defibrillator AED.
- Building a Safe Workspace: Your Complete Guide to Preparing First Aid in the Workplace.
- Building Site to Boardroom (BS2B).
- Competent person.
- Construction dust.
- Construction work in hot weather.
- Health and safety.
- Deleterious materials.
- Emergency services.
- Empowering the Construction Industry to take Action on Mental Health.
- Environmental health.
- Health and safety at work etc act 1974.
- Health and safety consultant.
- Health and Safety Executive.
- Health and safety file.
- Health and safety inspector.
- Health and safety policy.
- Near miss.
- Notification to HSE.
- Personal protective equipment PPE.
- Reporting accidents and injuries on construction sites.
- Risk of rats in construction.
- Site safety.
- Work at height regulations.
- Workplace safety supplies.
[edit] External references
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.