Furniture fixtures and equipment FF&E
FF&E refers to the procurement of furniture, fixtures and equipment.
This might be procured separately to the main construction contract (or elements of them), particularly by clients that already have systems in place for procuring fixed and loose furniture, fittings and equipment; for example schools, universities, or hospitals.
It is very important under such circumstances to define very clearly which contract every element of FF&E is within (for example, there may still be unusual or large items that it may be more sensible to procure under the main contract).
It is also important to ensure that any building work required for the installation of such items is identified and procured, that any services required (such as power or drainage) are identified and that the installation of FF&E is properly integrated into the main contract.
Requirements that affect the main contract might include:
- Built-in equipment requiring mechanical or electrical connections, such as fume cupboards or drinks stations. A description of built-in equipment should include; location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Built-in equipment that does not require services such as cupboards or shelving. These should be described in terms of their location and size.
- Stand-alone loose furniture and equipment requiring services, such as washing machines, coffee machines and scanning equipment in hospitals. These should be described in terms of their location, size, and requirements for power, air, water, drainage and telecommunications connection.
- Stand-alone loose furniture and equipment not requiring services such as tables and chairs. These should be described in terms of their location and size.
It is also important that any elements that are outside of the main contract are included in the client's cost plans.
FF&E can be procured from specialist suppliers, or suppliers with whom the client already has a long term relationship. This may include maintenance arrangements. Some elements may be specially designed by FF&E designers or sourced by FF&E consultants. There is also a need for a carefully managed FF&E inventory and logistical planning to ensure items are available on-site at the right time.
In managing the procurement of FF&E, consultants take on the complicated and time-consuming task of coordinating with the design team, external vendors and internal departments for the following:
- Programming and planning.
- Sourcing.
- Project procurement strategy and risk analysis.
- Request for proposal (RFP) document development.
- RFP process management.
- Contract negotiation and buy-out.
- Order expediting and tracking.
- Installation, product acceptance and close-out.
For more information, see FF&E consultant.
[edit] Related articles in Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.