Governance for Railway Investment Projects (GRIP)
Governance for Railway Investment Projects (GRIP) is a management and control process developed by Network Rail for delivering projects on the operational railway. Issue 2 of the GRIP Policy Standard (NR/L1/INI/PM/GRIP/100) was published on 3 March 2012.
GRIP was developed to minimise and mitigate the risks associated with projects to enhance or renew the operational railway and projects in a high street environment. It is based on best practice within industries that undertake major infrastructure projects and practice recommended by the bodies including the Association of Project Management (APM) and the Chartered Institute of Building (CIOB).
GRIP is product rather than process driven and divides projects into eight distinct stages:
- Output definition.
- Feasibility.
- Option selection.
- Single option development.
- Detailed design.
- Construction test and commission.
- Scheme hand back.
- Project close out.
Formal reviews examine the project at critical stages in its lifecycle to provide assurance that it can successfully progress to the next stage.
NB GRIP is being replaced by PACE (Project Acceleration in a Controlled Environment) due to concerns that GRIP its bureaucracy and linear process were too inflexible. PACE introduces a model based on principles rather than rules. Network Rail suggest that PACE; ‘… allows project managers to adapt their approach, make decisions that best meet the needs of their project and overlay stages while maintaining rigour.’
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.