Hard costs v soft costs
There are a wide variety of different construction costs that must be built into a project’s budget. Many of these can be divided into two categories; hard costs and soft costs.
Often referred to as 'brick-and-mortar costs', hard costs refer to the cost of physical construction, such as; foundations, superstructure, interior finishes, labourers, equipment, drainage and so on. Hard costs, being 'tangible', tend to be relatively easy to estimate but vary significantly according to the project type. For example, a complex facility such as a hospital will tend to have higher hard costs per square metre than an office building.
Soft costs are those costs that, unlike hard costs, are not instantly visible or tangible, and are not directly related to labour or building materials. This might include:
- Fees.
- Land costs.
- Off-site costs.
- Loans, accounting fees and interests.
- Insurances, permits and taxes.
- Public relations and advertising costs.
Unlike fixed equipment that is classified as a hard cost, moveable furniture and equipment are classified as soft costs. This includes items such as computer equipment, telephone systems, and so on. Costs that can continue post-completion such as maintenance, security and other up-keep-related fees are also deemed to be soft.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.