Integrated supply team
'Integrated supply team' is a term used to describe the integration of the complete supply chain involved in the delivery of a project. This may include the main contractor, designers, sub-contractors, suppliers, facilities managers, and so on.
The integrated supply team differs from the term 'integrated project team' as it relates only to the main contractor and their supply chain (designers, sub contractors, suppliers, etc.), whereas the integrated project team includes the client, and a project manager if there is one.
The relationship between the Integrated project team and the supply team is illustrated in OGC guidance as shown below:
[Image ref AE5:The integrated project team: teamworking and partnering P5.]
The integrated supply team is particularly relevant on public projects as the recommended procurement routes proposed by the government are private finance initiative (PFI), prime contracting and design and build with very early appointment of the integrated supply team. Under these routes, the entire supply team (designers, contractors, specialist suppliers and facilities managers) are appointed after the project brief has been prepared, and may involve just one single contract with the entire integrated supply team, not separate contracts with individual companies that make up the supply chain.
This is a model that is increasingly being adopted in the private sector, as clients seek a single point of responsibility for delivery of a project, and also because of the increasing need to involved specialist suppliers and contractors in the design process. The Strategic Forum Integration Toolkit suggests that contracting with a single supply team rather than separate companies is possible for small and occasional clients as well as larger more experienced clients.
NB: The Office of Government Commerce (OGC) has now been absorbed into the Efficiency and Reform Group (ERG) within the Cabinet Office. OGC guidance has been archived, however, it is cited in the Government Construction Strategy and the Common Minimum Standards.
[edit] Related articles on Designing Buildings Wiki
- Adversarial behaviour in the UK construction industry.
- Design and build.
- Collaborative practices.
- Consultancy.
- Consultant team.
- Corporate objectives for procurement.
- Designers.
- Government Construction Strategy.
- Green supply chain management.
- Integrated project delivery (IPD).
- Integrated project insurance.
- Integrated project team.
- Major Projects Authority.
- OGC.
- Prime contract.
- Private finance initiative.
- Public procurement.
- Supplier assessment.
- Supplier selection.
- Supply.
- Supply chain.
- Supply chain management.
[edit] External references
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.