Interface risk in construction
Interfaces are points of interaction between two or more aspects of a project:
- Physical interfaces occur where different contractors are engaged on the same project, particularly where their respective works interact or connect in some way.
- Relationship interfaces occur between different stakeholders on a project, such as; contractors, local community groups, regulatory bodies, the client, and so on.
Interface risk, and the failure to manage it effectively, is a common cause for problems on construction projects, giving rise to:
- Delays in completion.
- Claims for damages.
- Stakeholder complaints.
- Loss of profit.
- Industrial action.
- Regulatory infringements.
- Reputational damage.
Managing interface risks between the contracting parties typically involves contractual provisions which might include collaboration and co-operation clauses, clear and complete design documents and specifications, fit for purpose clauses, insurances and warranties, variation clauses and so on.
Interfaces between parties without a contractual relationship can be less straight-forward, but may involve:
- Alliancing and partnering agreements to encourage stakeholders to tackle interfaces early on, and promote a no-blame culture.
- Regular meetings between stakeholders to identify and manage new interfaces.
- Stakeholder mapping and stakeholder management strategies to predict how the project will affect stakeholders and how they can affect the project.
- Identifying and assessing third party dependencies.
It is important that responsibility for managing interfaces is allocated to a specific individual or organisation, as they can often fall between responsibilities or contracts. This is particularly important on large or complex projects where there may be a very large number of interfacing organisations, contracts and packages of work.
New technologies such as Building Information Modelling (BIM) can help identify both soft and hard interface risks, as well as encouraging effective collaboration between stakeholders on a project. Clash avoidance and clash detection should be carried out as an integral part of the design and construction process, from defining standard methods and procedures and establishing a BIM volume strategy, through to specialist design and the creation of a virtual construction model and should continue during the construction phase itself as models are updated with as-constructed information.
[edit] Related articles on Designing Buildings Wiki
- A solution to handle large and complex construction projects: Interface Management.
- Code of practice for project management.
- Conflict of interest.
- Design management.
- Method statement.
- Programme.
- Project manager.
- Receptor.
- Risk assessment.
- Risk in building design and construction.
- Risk management.
- Stakeholders.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.