An inverted roof, also referred to as a ‘protected membrane’ or ‘upside down’ roof, is form of flat roof in which the waterproofing layer is beneath the thermal insulation rather than above it.
The waterproofing layer is typically a liquid-applied membrane above a concrete roof slab, with insulation boards laid over the top, weighted down with either paving slabs or gravel ballast to protect against wind uplift and flotation. Rainwater percolates down through and between the insulation boards to the membrane where it is drained away through rainwater outlets.
One of the main benefits of the inverted roof method is that the membrane is protected by the insulation from the expansion and contraction caused by weather fluctuations, such as frost and solar radiation. It is also protected from damage by traffic on the roof, such as people walking, the movement of equipment and so on.
When calculating the U-value of the roof, consideration must be given to the fact that the insulation is likely to be wet a lot of the time, with some moisture trapped beneath the boards. This can create the risk of condensation occurring within the build-up of the roof, as the temperature of the membrane can be below the dew point. However, once the roof deck (and the membrane) warms up, the condensation will be able to evaporate. Problems can occur if the accumulation of condensation persists.
For more information, see Specifying insulation for inverted roofs.
For a case study of an inverted roof defect, see Inverted roof defect - case study.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.