NEC was first published in 1993 as the New Engineering Contract. It is a suite of construction contracts intended to promote partnering and collaboration between the contractor and client. It was developed as a reaction to other more traditional forms of construction contract which have been portrayed by some as adversarial. NEC is a division of Thomas Telford Ltd, the commercial arm of the Institution of Civil Engineers (ICE).
On 27 November 2015, at the Alliancing Code of Practice Launch at ICE's headquarters in London, it was announced that NEC would publish ‘Early Contractor Involvement’ (ECI) clauses for NEC contracts to help improve project collaboration. Ref ICE.
This move came in response to the increasing trend for early collaboration, which can be essential for projects using processes such as Building Information Modelling (BIM). ICE suggest that early contractor involvement '...supports improved team working, innovation and planning to deliver value for money'.
Previously, NEC projects often contracted design development and construction planning separately from detailed design and construction. The new clauses mean that a single NEC3 Engineering and Construction Contract (ECC) can be used for both stages where contractors are taking part in the design development and construction planning stage.
Peter Higgins, leader of the drafting team for the clauses, said, "This will allow the contractor to be appointed under a two-stage Engineering and Construction Contract (ECC) before details of what is to be constructed have been fully developed and priced.
"Two approaches to ECI are covered by the new clauses. The employer can engage the contractor to assist their consultant in designing the project, as well as to design specific elements. Following agreement of prices for the construction stage, the employer then instructs the contractor to deliver the works, including any outstanding design, under standard ECC Option C (target contract with activity schedule) terms.
"Alternatively, the employer can appoint the contractor to carry out the design with assistance from their consultant. The employer then instructs the contractor to deliver the works under standard ECC Option C or E (cost reimbursable contract) terms. If using Option E, the contractor can also be incentivised to provide a cost-effective design by sharing in the savings on the employer's budget, which includes other relevant costs incurred by the employer."
The clauses are available as a free download now from http://www.neccontract.com. NEC will also be releasing an advisory 'How To' guide to the clauses in 2016.
[edit] Related articles on Designing Buildings Wiki
- Atkins v Secretary of State for Transport.
- Collaborative practices.
- Construction contract.
- Contract conditions.
- Contractor's design portion.
- Defined cost.
- Delay damages.
- Early appointment / involvement.
- Early contractor involvement.
- FIDIC.
- Institution of Civil Engineers.
- JCT.
- Latham Report
- Management contract.
- NEC contract change management systems.
- NEC contracts - road development and management schemes.
- NEC3.
- Optimised contractor involvement.
- Period for reply.
- Procurement route.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.