Non-performance in the construction industry
Non-performance is a general term that describes a party which fails to perform; in fact, the term can cover all forms of failure in performance. A student who fails end-of-year exams may be regarded by the school as a non-performer. In this respect, non-performance is not contractually linked – the student never promised to do well and there was no contact entered into, written or otherwise.
In simple terms, a contract is a legally-binding promise. From a legal perspective, the basis of every contract is that all parties must fulfil all of the contract's terms. Non-performance occurs when one party to the contract does not fulfil the contract terms – failing to live up to their contractual obligations. Such a failure is not necessarily a breach of contract although it could lead to a breach of contract.
A breach of contract in English Law is non-performance that is not excused because it is the non-performance of a contractual obligation, i.e. a promise was made and was not kept. A breach of contract entitles the innocent party to receive damages from the guilty party. It may also allow the innocent party the right to terminate the contract.
An example of non-performance is a contractor who fails to provide sufficient labour, materials or equipment to a project, leading to a delay to the completion date.
Bonds can provide a degree of protection for the client. Bonds are an undertaking by a bondsman or surety to make a payment in the event of non-performance. Bonds can be 'on demand' or 'conditional', with conditional bonds requiring that the client provides evidence of the contractor's non-performance, and that as a consequence the client has suffered a loss.
[edit] Refusal to perform or declaration of non-performance
A declaration of non-performance is another form of non-performance. One party declares they are abandoning any further performance under the contract or refuses to fulfil an essential aspect of the contract. In this case, the innocent party can discharge themselves from any further performance obligations.
[edit] Related articles on Designing Buildings Wiki
- Bonds in construction contracts.
- Construction contract conditions
- Contractual obligation.
- Contractual right.
- Delay analysis.
- JCT
- JCT Construction management contract
- Performance bond
- Procurement team
- Standard form of contract
- Tender documentation for construction projects
- Traditional contract for construction
- Traditional contract: tender
- Typical tender process for construction projects
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.