A power surge is when an unusually high voltage occurs in an electrical system for a short period. It may also be referred to as a transient surge because it involves a transient wave of voltage, current or power which usually occurs between the normal waves of voltage. The over voltage can be additive or subtractive with positive or negative polarity lasting less than a half-cycle, or at little as 50 microseconds but surges can reach 6000 Volts and 3000Amps which can cause damage.
Power surges often occur after power cuts or blackouts as systems are reinstalled or turned on again. Lightening strikes can cause power cuts but can also cause power surges as the systems absorb the excess electrical power of the lightening strike, which can damage equipment plugged into the circuit. Other common causes of power surges are faulty wiring and when systems are overloaded or drawing too much power.
Occurrences where systems draw too much power can be localised to individual buildings where for example too many pieces of equipment are plugged into the same socket, drawing too much power which can cause damage or in some cases fire. These events can also occur on a wider scale such as for example during what is known as TV pickup, which describes the phenomenon of many people demanding power at the same time, which might happen during commercial TV breaks when viewers all put the kettle on at the same time. One example of this occurred at the end of the FIFA World Cup semi-final after a penalty shoot-out between England v West Germany in 1990 when the UK demand at that point was 2800 megawatts.
Common methods exist to deal with power surges, most of which aim to earth any excess power from a lightening bolt safely to the ground rather than through an electrical system, many of which are written into installation guidance or recommended by the building regulations such as lightening protection systems. Other practical measures to avoid damage to individual equipment during a power surge that occurs after a power cut (or during a storm with likely lightening bolts) include unplugging equipment from those circuit, thus removing the risk to individual appliances or earthing individual appliances within the circuit.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.