Prescriptive rights of way
Rights of way across the land of others can become established if they have been used openly and without force for at least 20 years. However, such use must also be without permission and, as one case showed, that can often prove a sticking point.
In the case of Welford & Ors v Graham & Anr. [2017], the owners of land on which a workshop stood claimed a vehicular right of way over an adjoining yard. The First-tier Tribunal (FTT) found that the yard had been used as a means of vehicular access to the workshop for the required 20-year period.
However, in refusing to recognise a right of way, the FTT noted that the workshop owners had only succeeded in proving that the relevant use of the yard had been without the permission of its owners for 10 years. It had therefore not been established that the use had been as of right for two decades or more.
In upholding the workshop owners’ appeal against that decision, however, the Upper Tribunal (UT) found that the FTT had misapplied the burden of proof. Having established that the yard had been used as an access route openly and without interruption for the required period, the workshop owners had the benefit of an evidential presumption that that use had been without permission and as of right.
The yard owners had not called any evidence to rebut that presumption and the workshop owners had thus discharged the burden of showing relevant use, as of right, for a sufficient period. In the circumstances, the UT directed that the right of way be registered as an established burden on the yard owners’ land.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.