Construction product approval process
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, defines the Construction Product Approval Process (CPAP) as: ‘An adaptation of Production Part Approval Process (PPAP) that is aimed at those enterprises that will feed construction with new componentry for offsite builds.’
The Production Part Approval Process is: ‘A process, standardised by both the automotive and aerospace industries, that outlines the steps and requirements for approval of production designs and/or manufacturing processes throughout the product development cycle. It also ensures that the entire supply chain understands these steps when procuring externally manufactured parts.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Bill of quantities breakdown structures.
- Construction Innovation Hub.
- Construction quality planning.
- Plan, Do, Check, Act (PDCA).
- Poka-yoke.
- Product Breakdown Structure.
- Product design requirements.
- Product validation.
- Project quality plan.
- Quality control.
- Quality in construction projects.
- Quality.
- Six Sigma.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.