SSE begins BESS construction in North of England
ECA Member SSE Energy has begun building a Battery Energy Storage Site (BESS) in West Yorkshire.
The project, which is located at the company’s former Ferrybridge coal-fired power station, is being developed in conjunction with battery technology supplier Sungrow Power Supply and construction partner OCU Services. The site will be able to provide the grid with 300MWh of flexible capacity for two hour periods. Construction is expected to be complete by the end of 2024.
Richard Cave-Bigley, director of solar and battery at SSE Renewables, said: “We’re breaking new ground with our first battery at an existing SSE site. Ferrybridge used to be a coal site; but today we’ve evolved to building a 150MW flexible battery asset that can store the energy we need to help get to net zero.”
Lewis Li, president of Sungrow Europe, added: “Sungrow is proud to supply our liquid cooled energy storage system, the PowerTitan, to this landmark project. We are excited for what is to come with our partnership with SSE Renewables as we work towards maximising the profitability for the project with cutting-edge products and services.”
The Ferrybridge project will become SSE Renewables’ second battery storage project in delivery with the company already constructing a 50MW project in Salisbury.
ECA works closely with its Members, industry partners and Government to help Britain transition to Net Zero Carbon. We produce regular guidance notes, technical bulletins, and industry updates to keep Members at the forefront of the Net Zero transition. Learn more here.
This article appears on the ECA news and blog site as "SSE begins BESS construction in North of England" dated August 24, 2023.
--ECA
[edit] Related articles on Designing Buildings
- Battery storage
- Battery energy storage systems with grid-connected solar photovoltaics BR 514.
- DC isolators for photovoltaic systems (FB 68).
- Domestic micro-generation.
- Energy price crisis: ECA calls for energy levy reform.
- Energy storage - the missing piece?
- Energy storage for buildings.
- Energy storage in buildings - a technology overview BG73 2018.
- Flow battery.
- Fly wheel.
- Fuel cell.
- Graphene batteries.
- Lead-acid battery.
- Lithium-ion battery.
- The use of batteries to store electricity for buildings.
- Why the UK needs to support emerging tech like energy storage.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.